May 22, 2025, 7:02 p.m.

54 million allocated for restoration of Yuzhnobuhskyi bridge in Mykolaiv

(PHOTOS: Suspilne)

Mykolaiv has announced a tender for more than UAH 54 million to maintain the Pivdenobugskyi Bridge. The works are to be completed by the end of 2026, and the winner will be determined at the end of May.

This is according to the Prozorro procurement system.

The Service for Infrastructure Restoration and Development in Mykolaiv Oblast has announced a tender for the operational maintenance of the Pivdennyi Buh Bridge over the Pivdennyi Buh River. The bridge is a part of the M-14 Odesa-Melitopol-Novoazovsk national highway. The expected cost of the works is over UAH 54 million.

The second stage of works will include maintenance of bridge structures in spans 4-8. The task involves construction and installation services that are included in the classification "construction and maintenance of roads, communication lines, power lines, and leveling of surfaces."

Screenshot: Prozorro

Bids can be submitted until May 29, and the electronic auction is scheduled for May 30. The winner will have to ensure the fulfillment of the contract by providing a bank guarantee in the amount of 1% of the cost of the work. The works are to be completed by December 20, 2026.

The customer is the Service for Infrastructure Restoration and Development in Mykolaiv Oblast. Under the terms of the tender, an advance payment of up to 30% of the annual cost of the works is possible.

This is not the first tender for the maintenance of this bridge. At the end of April, the Restoration Service announced an auction for the operational maintenance of the Pivdenne Bug Bridge on the M-14 Odesa-Melitopol-Novoazovsk highway, stating that it was the first stage of construction.

Only one company, the European Road Construction Company, applied for the tender. Its offer was 257 thousand hryvnias lower than the expected cost, so it was this company that was awarded the contract to repair the bridge in Mykolaiv. This company has been repeatedly mentioned in journalistic investigations - it has been linked to numerous non-competitive contracts worth hundreds of millions of hryvnias.

Анна Бальчінос

Також Вам може сподобатись:

March 12, 2026

Almost 39 km of water supply networks are being reconstructed in Mykolaiv

A popular tram route in Mykolaiv was shut down due to CHP works

March 11, 2026

Tenant acquires winery in Odesa region for 10 million

High-profile case in Mykolaiv: former SSO commander denies high treason

Renovation of a school canteen in Odesa region attracts law enforcement interest

Water distribution points will be temporarily suspended in Mykolaiv: the reason is given

Mykolaiv to sell 48 million tons of sludge

Hundreds of millions and crime: what the reconstruction of a special school in Odesa has revealed

Fortifications in Kherson region: the department buys construction materials worth millions

Drones with video communication: Russia modernizes attacks on southern Ukraine

March 10, 2026

The National Bank failed to sell a complex of warehouses in Odesa for 96 million

State Land Bank wins court case for 5 thousand hectares of land in Odesa region

Profiteering from farmers: ex-officials of the State Service of Ukraine for Food Safety and Consumer Protection from Mykolaiv region will be tried for bribery

March 9, 2026

A repair project in Odesa region was ordered by a company associated with a former police officer

Mykolaiv investigates booking scheme through sports schools