17 April 2025

Mykolaiv Allocates ₴19.7M for Pivdenobugskyi Bridge Maintenance Tender

(PHOTO: Korabelov.info)

Mykolaiv has announced a tender for almost UAH 20 million to maintain the Pivdenobugskyi bridge on the M-14 highway. The work is scheduled to be completed by the end of 2025.

This is evidenced by the data of the electronic public procurement system Prozorro.

The Infrastructure Restoration and Development Service in Mykolaiv Oblast has announced a tender for the operational maintenance of the Pivdenne Bug Bridge on the M-14 Odesa-Melitopol-Novoazovsk highway.

The expected cost is UAH 19.7 million. The minimum step down in price is UAH 98 thousand 636, i.e. 50% of the expected value.

The bridge is located in Mykolaiv on the 132nd kilometer of the highway, within spans 4-8. The works should cover the first phase of the structure's maintenance and be completed by December 20, 2025.

Screenshot: Prozorro

Bids will be accepted until May 1, and the auction is scheduled for May 2. The customer allows advance payments of up to 30% of the cost of the work. The used advance payment will be repaid on the basis of certificates of completion.

The winning contractor must provide a bank guarantee for 1% of the contract amount. The documents must confirm the company's ability to guarantee the proper fulfillment of the contract. The customer is the Service for Infrastructure Restoration and Development in Mykolaiv Oblast.

Another tender has also been announced in Mykolaiv region, this time for the maintenance of the Ingul bridge. More than UAH 26 million has been allocated for the works, which are to be completed by the end of 2025, and the contractor will be selected at an open tender.

According to Intent's analysis, last year, the Infrastructure Restoration and Development Service in Mykolaiv Oblast was the customer of the most expensive procurement in the region, worth more than UAH 13 billion. One of the largest was a UAH 2.2 billion deal for the construction of a traffic interchange near the Pivdenobugskyi Bridge on the M-14 highway.

Анна Бальчінос

You may also like:

Aug. 20, 2026

In Mykolaiv, a doctor was not suspended from his position for disability fraud schemes

No one was willing to buy Odessa's Central Department Store for 400 million

In Mykolaiv, officials approved the transfer of the land beneath the stadium to the community

Aug. 19, 2026

The restoration service was unable to provide a cost estimate for the restoration of the Varvarivsky Bridge

A soldier was detained at the Mykolaiv pretrial detention center for corruption schemes involving the military

Three soldiers were beaten in Mykolaiv for detaining a man in the Northwest Military District

An attempt to blame his treason on his own stupidity cost a Mykolaiv resident his freedom

New wastewater discharge rates have been proposed for an agricultural enterprise in Mykolaiv

Residents of Vinnytsia outmaneuvered the Odessa lawmaker's company in the race for a 700-million tender

The head of the Mykolaiv Regional Territorial Coordination Center was suspended from his post for accepting a bribe

Only a company owned by a lawmaker submitted a bid for a 238-million road repair project in the Odesa region

Odessa has decided who will provide meals for schoolchildren at a cost of 302 million

A Mykolaiv lawmaker and landowner earned nearly a million from rent

Aug. 18, 2026

In Mykolaiv, passengers wearing embroidered shirts will ride for free on Independence Day

A new company, with no competitors, was awarded a 15-million contract in the Kherson region using EU funds