Intent logo

Dec. 23, 2024, 2:28 p.m.

UAH 94 million to be raised for overhaul of Voznesenskyi Lyceum in Mykolaiv region

PHOTO: Dream

(PHOTO: Dream)

The Voznesensk Lyceum in Mykolaiv region is to be renovated and insulated. It is planned to find funding for more than 94 million hryvnias.

This was reported by the Center for Public Investigations with reference to the Dream ecosystem.

It is planned to overhaul and thermally modernize the buildings of Ascension Lyceum No. 10 at 20 Sobornosti Street.

The purpose of the reconstruction is to provide quality educational services for community children. The project was initiated by the Voznesensk City Council.

Screenshot: Dream

According to the project description, the complex of buildings, which became the property of the Voznesensk community in December 2022, needs major repairs. The roof is leaking, mold has appeared on the walls, the heating main is rotten, and the internal network and some windows are damaged. After the renovation, it will be used as a specialized lyceum with a dormitory for students from different communities.

The estimated duration of the project is 24 months. The project budget is UAH 94 million 693 thousand 922.

The project is aimed at creating comfortable and safe conditions for children to stay in the building of the educational institution, improving its technical condition and appearance. It ensures the repair and preservation of communal property, improvement of thermal comfort, and budgetary savings by reducing energy consumption.

Screenshot: Dream

The lyceum reconstruction project is currently in preparation and requires funding.

In addition, 23 million hryvnias are to be raised for the energy-efficient reconstruction of Mykolaiv Gymnasium #56. The design and estimate documentation was completed in 2017-2019 and needs to be adjusted. The goal of the project is to improve the energy efficiency and comfort of the gymnasium's premises, to provide optimal conditions for study and recreation for students and staff.

And UAH 20 million was allocated from the local budget for the insulation of the Mykolaiv kindergarten. We are planning to reconstruct the building of preschool educational institution No. 52 with thermal sanitation. The project aims to maintain optimal temperature conditions and reduce heating costs.

Анна Бальчінос

You might also like:

April 16, 2025

Kherson Oblast Lyceum Modernizes Canteen for 340 Students with ₴200K Funding

April 17, 2025

UAH 27M Heating Network Overhaul Launched in Pivdenoukrainsk, Mykolaiv Region

April 14, 2025

Mykolaiv Plans ₴16.8M Apartment Building Restoration After Russian Shelling

April 19, 2025

Odesa, Mykolaiv, Kherson Regions Receive ₴829.2M for School Shelters

April 20, 2025

Denmark Allocates ₴ 477M for 33 Recovery Projects in Mykolaiv Region

April 14, 2025

Ochakiv Boarding School to Transition into Mykolaiv Academic Lyceum by 2025

April 20, 2025

Mykolaiv Allocates ₴9M for Outpatient Clinic Repairs by 2026

April 16, 2025

Mykolaiv Launches ₴19.4M Water Supply Reconstruction Tender by 2025

April 14, 2025

Kherson Hospital Plans ₴38.3M Basement Renovation for Safe Shelter

April 13, 2025

Mykolaiv Awards ₴600M Children's Hospital Reconstruction to Antares-BUD Amid Criminal Proceedings

April 10, 2025

Mykolaiv Hospital Plans ₴30M Modern Shelter for Patient Safety and Education

April 9, 2025

Mykolaiv City Council Plans Radiation Shelter for Kindergarten by 2026

April 18, 2025

Odesa Allocates ₴37.9M for New Municipal Youth Hub Overhaul

Mykolaiv City Council to Allocate ₴50M for Debt Repayment and Budget Amendments on April 24, 2025

April 12, 2025

Kyselivka Gymnasium Reconstruction Announced with ₴100M Budget