13 December 2024

UAH 23 million to be raised for energy-efficient reconstruction of Mykolaiv gymnasium

(PHOTO: Dream)

Mykolaiv plans to restore and insulate a gymnasium. More than 23 million hryvnias are to be raised for this purpose. Part of the funds were provided from the budget during 2017-2019.

This was reported by the Center for Public Investigations with reference to the state digital ecosystem Dream.

It is planned to reconstruct the building of Mykolaiv Gymnasium #56 with thermal sanitation. The project was initiated by the Mykolaiv City Council and executed by the Department of Energy, Energy Saving and Implementation of Innovative Technologies.


Screenshot: Dream

The goal of the project is to improve the energy efficiency and comfort of the gymnasium's premises, to provide optimal conditions for studying and recreation for students and staff.

The design and estimate documentation was completed in 2017-2019 and needs to be adjusted.

It is planned to raise UAH 23 million 620 thousand 845 for the energy reconstruction of the gymnasium. More than UAH 20 million will be spent on construction and UAH 2.2 million on other capital expenditures. In 2018, UAH 731,403 was allocated for the design. The design and estimate documentation developed in 2017-2019 has yet to be updated. In total, UAH 882,403 was spent from the city budget in 2017-2019.


Screenshot: Dream

According to the project description, it is planned to insulate the building's basement, slopes and walls, reconstruct the roof, replace the thermal insulation layer of the attic floor, exterior windows and doors, repair entrances, and install bins and containers for solid waste. It is noted that these are just a few examples of technical solutions that can be used to reconstruct the building of Mykolaiv Gymnasium #56 to improve energy efficiency and create a comfortable environment for students and staff.


PHOTO: Dream

We also decided to modernize the classrooms of Mykolaiv Construction College. Denmark provided funds for the reconstruction and arrangement of the educational institution. The goal is to create modern learning environments, improve the energy efficiency of the building, and provide a safe and comfortable environment for students and teachers. The project budget is UAH 12 million.

And the South Ukrainian Lyceum decided to build a shelter. More than UAH 72 million was allocated from the city budget. General construction works, water supply and sewerage, heating and ventilation, electrical solutions, and fire alarm installation are planned.

Анна Бальчінос

You may also like:

Aug. 11, 2026

A 27-year-old communist from Pervomaisk was convicted of treason

In Mykolaiv, the search has begun for a caterer for schoolchildren at a cost of 135 million

Mykolaiv Region Was Attacked by UAVs: Homes Damaged, 75-Year-Old Woman Injured

Aug. 10, 2026

The SBU detained a Russian agent from Kherson who was planning to kill a soldier

A child drowned for the second time at a closed beach in Mykolaiv

The director of the Mykolaiv City Hospital declared a Lexus at a bargain price

A spy was arrested in Mykolaiv for plotting to kill a soldier in Kyiv

The enemy struck a church in the Mykolaiv region

Aug. 9, 2026

The teacher who fell out of a school window was cleaning it on her own initiative — City Hall

Online Education and Studying Abroad: How to Combine a Ukrainian School with an International Education Advertisement

The father of the secretary of the Mykolaiv City Council gave his son a million

Three people were killed in a traffic accident in the Odesa region; eight others are in the hospital

Aug. 8, 2026

Plans are in place to set up 840 shelters in the Kherson region and other frontline regions

How to Enhance Your Natural Glow: Choosing the Perfect Blush for Everyday Makeup Advertisement

The Kinburn Spit became a trap for the Russian army