01 December 2024

Denmark provides millions to modernize classrooms of Mykolaiv Construction College

(PHOTO: Oksagen)

Mykolaiv decided to modernize its construction college. Denmark provided funds for the reconstruction and arrangement of the educational institution.

This was reported by the Center for Public Investigations with reference to the state digital ecosystem Dream.

It is planned to modernize classrooms as part of the reconstruction of the Mykolaiv College of Construction. The project was initiated by the Mykolaiv City Council. The estimated duration of the project is 12 months.

<span><span><span><span><span><span><span><span><span><span><span></span></span></span></span></span></span></span></span></span></span></span>
Screenshot: Dream

The aim of the project is to repair and reconstruct the Mykolaiv College of Construction in order to create modern learning environments, improve the energy efficiency of the building, and provide a safe and comfortable environment for students and teachers.

The project will include cosmetic and major repairs of classrooms and auditoriums; installation of modern training equipment and new furniture; facade and roof insulation; replacement of windows and doors with energy-efficient ones; and installation of a new heating and air conditioning system.

The project budget is UAH 12 million, with funds for the modernization provided by Denmark.

<span><span><span><span><span><span><span><span><span><span><span></span></span></span></span></span></span></span></span></span></span></span>Screenshot: Dream

In addition, it is planned to repair the roof, floors, walls, and ceilings, upgrade plumbing fixtures and water supply and sewage systems, install a fire protection system, and install video surveillance. The college will also create recreation areas with benches, gazebos and places for active recreation for students.

It is also planned to reconstruct the children's music school, for which UAH 8 million has already been allocated from the city budget. In total, the city plans to raise more than UAH 23 million for the reconstruction. They tried to implement the project five years later.

In addition, a second tender was announced for the construction of a shelter for the Oleksandrivsk Lyceum. Due to project adjustments, the previous agreement was terminated. The expected cost of construction is over UAH 31 million. Previously, a contract was signed in 2023 for UAH 36 million, but the agreement was terminated.

Анна Бальчінос

You may also like:

Aug. 11, 2026

A 27-year-old communist from Pervomaisk was convicted of treason

Analysts said that 76 percent of Kherson residents see no signs of recovery

In Mykolaiv, the search has begun for a caterer for schoolchildren at a cost of 135 million

Mykolaiv Region Was Attacked by UAVs: Homes Damaged, 75-Year-Old Woman Injured

Aug. 10, 2026

The SBU detained a Russian agent from Kherson who was planning to kill a soldier

A child drowned for the second time at a closed beach in Mykolaiv

The director of the Mykolaiv City Hospital declared a Lexus at a bargain price

A spy was arrested in Mykolaiv for plotting to kill a soldier in Kyiv

The enemy struck a church in the Mykolaiv region

Aug. 9, 2026

Online Education and Studying Abroad: How to Combine a Ukrainian School with an International Education Advertisement

The father of the secretary of the Mykolaiv City Council gave his son a million

Three people were killed in a traffic accident in the Odesa region; eight others are in the hospital

Aug. 8, 2026

Plans are in place to set up 840 shelters in the Kherson region and other frontline regions

How to Enhance Your Natural Glow: Choosing the Perfect Blush for Everyday Makeup Advertisement

The Kinburn Spit became a trap for the Russian army