Jan. 27, 2025, 4:31 p.m.

Pravdino Village to Invest ₴57.7M in Water Supply System Repair

(Photo: DREAM)

The village of Pravdino, Kherson district, is planning to repair the water supply system. This requires UAH 57.7 million.

The announcement was made in the DREAM Digital Ecosystem by the Territorial Development Department of the Kherson Regional State Administration.

Photo: DREAM screenshot

As stated in the announcement, the overhaul of the water supply system in the village of Pravdino is being carried out to eliminate the emergency, ensure stable water supply to residents and comply with sanitary and hygienic standards. The emergency condition of the system leads to interruptions in water supply, deterioration of water quality, and poses risks to public health.

Therefore, the goal of the project is to eliminate the emergency and ensure uninterrupted water supply for 1500 residents. The plans are to lay 5 kilometers of pipeline, repair 10 existing wells, and install 5 new ones. The project also includes replacing pumps with more energy-efficient ones, repairing the pumping station premises, and upgrading electrical switchboard equipment.

The total cost of the project is UAH 57.7 million. UAH 19.7 million was allocated from the state reserve fund for the project.

Earlier, the Department of Territorial Development of the Kherson Regional State Administration announced its intention to restore the hospital building in the village of Velyka Oleksandrivka. The cost of the work, according to the project, is UAH 120.7 million. Before that, the department announced that it was looking for money to build a general family medicine outpatient clinic in the village of Davydiv Brid.

In addition, the Verkhnorohachytsia village council announced its intention to purchase a set of equipment and a car for a mobile ASC. They plan to spend a little over UAH 1 million. And the Kherson Regional Hospital for Rehabilitation has announced the creation of a 30-bed MentalHealth Unit. The arrangement of which can cost the budget 11 million hryvnias. At the same time, the hospital itself can allocate only 93 thousand hryvnias out of 11 million.

In total, since the beginning of the year, 11 facilities have been added to the DREAM Digital Ecosystem for Accountable Recovery Management, which are planned to be restored in 2025. At the same time, the cost has been calculated for only two reconstruction projects: the repair of the Mental Health Unit and the reconstruction of the Vysokopil Lyceum building.

Олеся Ланцман

Також Вам може сподобатись:

Feb. 20, 2026

Former plant director found guilty of torture in Kherson region

500 million planned for electronic intelligence and protection of population in Kherson

Passing intelligence in Kherson cost Russian agent life imprisonment

Enemy army attacks railroad, factory and village club in Kherson region

Traitor from Kherson region sentenced for serving in enemy army

Feb. 19, 2026

Court terminates contract for repair of Kherson school worth 2.6 million

Germany invests one million euros in energy security of Kherson region

World Police Launches Search for Stolen Valuables from Kherson Museums by Russia

Feb. 18, 2026

Fake deputy from Kherson region teaches schoolchildren to love the occupiers

Occupants shelled two buildings of Kherson State University

Odesa region is among the outsiders in terms of profits from subsoil

Kherson City Council prepares audit of budget expenditures in 2026

State Bureau of Investigation investigates the circumstances of the death of the crew of the Kherson air brigade

Feb. 17, 2026

Russian troops shelled a hospital in Kherson three times in one day

Hotel owner from Kherson region suspended for attempting to transfer business to Russians