Intent logo

Jan. 27, 2025, 4:31 p.m.

Pravdino Village to Invest ₴57.7M in Water Supply System Repair

Photo: DREAM

(Photo: DREAM)

The village of Pravdino, Kherson district, is planning to repair the water supply system. This requires UAH 57.7 million.

The announcement was made in the DREAM Digital Ecosystem by the Territorial Development Department of the Kherson Regional State Administration.

Photo: DREAM screenshot

As stated in the announcement, the overhaul of the water supply system in the village of Pravdino is being carried out to eliminate the emergency, ensure stable water supply to residents and comply with sanitary and hygienic standards. The emergency condition of the system leads to interruptions in water supply, deterioration of water quality, and poses risks to public health.

Therefore, the goal of the project is to eliminate the emergency and ensure uninterrupted water supply for 1500 residents. The plans are to lay 5 kilometers of pipeline, repair 10 existing wells, and install 5 new ones. The project also includes replacing pumps with more energy-efficient ones, repairing the pumping station premises, and upgrading electrical switchboard equipment.

The total cost of the project is UAH 57.7 million. UAH 19.7 million was allocated from the state reserve fund for the project.

Earlier, the Department of Territorial Development of the Kherson Regional State Administration announced its intention to restore the hospital building in the village of Velyka Oleksandrivka. The cost of the work, according to the project, is UAH 120.7 million. Before that, the department announced that it was looking for money to build a general family medicine outpatient clinic in the village of Davydiv Brid.

In addition, the Verkhnorohachytsia village council announced its intention to purchase a set of equipment and a car for a mobile ASC. They plan to spend a little over UAH 1 million. And the Kherson Regional Hospital for Rehabilitation has announced the creation of a 30-bed MentalHealth Unit. The arrangement of which can cost the budget 11 million hryvnias. At the same time, the hospital itself can allocate only 93 thousand hryvnias out of 11 million.

In total, since the beginning of the year, 11 facilities have been added to the DREAM Digital Ecosystem for Accountable Recovery Management, which are planned to be restored in 2025. At the same time, the cost has been calculated for only two reconstruction projects: the repair of the Mental Health Unit and the reconstruction of the Vysokopil Lyceum building.

Олеся Ланцман

You might also like:

March 20, 2025

Nova Kamianka to Build ₴96.3M Administrative Center in Kherson Region

March 23, 2025

Ukraine Approves 68 Water Supply Projects Worth ₴2 Billion for Recovery

March 25, 2025

Kherson District Allocates ₴70M for Urgent Road Repairs and Maintenance

March 24, 2025

Kherson Oblast Launches ₴5.4M Centralized Warning System for Emergencies

March 23, 2025

Mykolaiv Regional Clinical Hospital Spends Over ₴20M on Medical Services in 2025

Dubious Contractor Antares-Bud Secures ₴21M Shelter Renovation in Mykolaiv

March 22, 2025

₴170 Million Planned for Public Road Maintenance in Beryslav, Kherson

March 23, 2025

Mykolaiv Region Allocates ₴12.7M for Overhaul of Art School Damaged by Russian Shelling

March 14, 2025

Construction of Outpatient Clinic in Davydiv Brid Costs ₴ 15.3M More

March 17, 2025

Kryvoozersky Lyceum No. 1 Starts ₴15M Overhaul for Safe Learning Environment

March 21, 2025

Mykolaiv Allocates ₴4.1M for Boiler House Reconstruction with Gas Cogeneration Unit

March 17, 2025

Mykolaiv's 2024 Urban Planning Projects Exceed ₴1.5 Billion in Spending

March 18, 2025

Kherson Oblast Announces New ₴59.3M Tender for Home Repairs After Errors

March 22, 2025

Posad-Pokrovske's ₴5.2B Reconstruction Plan: 362 Homes to be Restored

March 20, 2025

Mykolaiv to Reconstruct Water Supply Network on Budivelnykiv Street for ₴3.2M