26 January 2025

Kherson Oblast seeks over 33 million for construction of rural outpatient clinic

(Photo: Dream)

A general family medicine outpatient clinic is planned to be built in the village of Davydiv Brid in Kherson Oblast. The cost of the project is UAH 33.5 million, with UAH 21.9 million available.

The relevant announcement wasmade in the DREAM Digital Ecosystem by the Territorial Development Department of the Kherson Regional State Administration.

Photo: screenshot from DREAM

<span>The purpose of the construction of the facility is to provide modern conditions for medical staff. Accessibility of quality medical care for the local population.</span>

The project envisages the construction of a one-story outpatient clinic building that will meet modern standards of functionality, energy efficiency and inclusiveness. The building will be provided with all the necessary utilities, including water supply, sewage, electricity, heating, ventilation and fire protection.

The outpatient clinic is to be equipped with doctors' offices, a treatment room and a vaccination room. In addition, a comfortable waiting area for patients will be created. There is also the possibility of installing solar panels to partially meet energy needs and a rainwater collection system for technical needs.

The total cost of the project is UAH 33.5 million. The European Investment Bank agreed to provide UAH 21.3 million.

Photo: screenshot from DREAM

Earlier, the Verkhnorohachytsia village council announced its intention to purchase a set of equipment and a car for the mobile ASC. They plan to spend a little over UAH 1 million. And the Kherson Regional Hospital for Rehabilitation has announced the creation of a 30-bedMental Health Unit. The arrangement of which can cost the budget 11 million hryvnias. At the same time, the hospital itself can allocate only 93 thousand hryvnias out of 11 million.

In total, since the beginning of the year, 11 facilities have been added to the DREAM Digital Ecosystem for Accountable Recovery Management, which are planned to be restored in 2025. At the same time, the cost has been calculated for only two reconstruction projects: the repair of the Mental Health Unit and the reconstruction of the Vysokopil Lyceum building.

Олеся Ланцман

You may also like:

June 19, 2026

How a Gold Ring Is Made: A Look Inside a Handcrafted Workshop Advertisement

A war crime was uncovered in the Kherson region: a woman was tortured and raped for three days

June 18, 2026

The occupiers are threatening to strike retail outlets in Kherson

In Odesa, heat suppliers spent 100 million on insulation, fuel, and power generation

Court officials in the Kherson region have declared more than 8 million hryvnias

Only three courts are still operating in the Kherson region following the occupation

The occupiers are deploying boat units to the sea for operations off the coast of the Kherson region

A police officer and a married couple were wounded in Russian attacks in the Kherson region

June 17, 2026

Judges in the Kherson region reported incomes in the millions and no savings

In the Kherson region, the Ukrainian Armed Forces struck a bridge and a UAV command post

In the occupied Kherson region, the Russians have built dozens of kilometers of underground tunnels

A campaigner for Russia's so-called referendum was detained in Kherson

When everything is in its place, or when accessories are chosen just right—and their magic Advertisement

The owner of a Kherson TV station was sentenced to 12 years for collaboration

Two people were killed and 11 others were wounded in the Kherson region as a result of Russian aggression