Jan. 26, 2025, 10:22 p.m.

Kherson Oblast seeks over 33 million for construction of rural outpatient clinic

(Photo: Dream)

A general family medicine outpatient clinic is planned to be built in the village of Davydiv Brid in Kherson Oblast. The cost of the project is UAH 33.5 million, with UAH 21.9 million available.

The relevant announcement wasmade in the DREAM Digital Ecosystem by the Territorial Development Department of the Kherson Regional State Administration.

Photo: screenshot from DREAM

<span>The purpose of the construction of the facility is to provide modern conditions for medical staff. Accessibility of quality medical care for the local population.</span>

The project envisages the construction of a one-story outpatient clinic building that will meet modern standards of functionality, energy efficiency and inclusiveness. The building will be provided with all the necessary utilities, including water supply, sewage, electricity, heating, ventilation and fire protection.

The outpatient clinic is to be equipped with doctors' offices, a treatment room and a vaccination room. In addition, a comfortable waiting area for patients will be created. There is also the possibility of installing solar panels to partially meet energy needs and a rainwater collection system for technical needs.

The total cost of the project is UAH 33.5 million. The European Investment Bank agreed to provide UAH 21.3 million.

Photo: screenshot from DREAM

Earlier, the Verkhnorohachytsia village council announced its intention to purchase a set of equipment and a car for the mobile ASC. They plan to spend a little over UAH 1 million. And the Kherson Regional Hospital for Rehabilitation has announced the creation of a 30-bedMental Health Unit. The arrangement of which can cost the budget 11 million hryvnias. At the same time, the hospital itself can allocate only 93 thousand hryvnias out of 11 million.

In total, since the beginning of the year, 11 facilities have been added to the DREAM Digital Ecosystem for Accountable Recovery Management, which are planned to be restored in 2025. At the same time, the cost has been calculated for only two reconstruction projects: the repair of the Mental Health Unit and the reconstruction of the Vysokopil Lyceum building.

Олеся Ланцман

Також Вам може сподобатись:

May 9, 2026

Declarations of Kherson regional council deputies show millions in assets

Odesa court sends Kherson resident to prison for working for occupiers in colony

Holding people in a well and beating them with rifle butts: a Russian militant was sentenced in Kherson

US journalist says there is an information vacuum about the human safari in Kherson

Government allocates 96 million for anti-drone defense of Kherson region

May 8, 2026

Police start investigating procurement for schools in Chornomorsk

Employee of Kherson Lyceum is imprisoned for implementing the Russian educational program

Authors of propaganda textbook for occupied Kherson region sentenced to 10 years in prison

Head of HR department of Kherson state institution sentenced to 5 years

Mykolaiv region is among the leaders in stolen weapons

In Oleshky, 6 thousand people are waiting for evacuation from occupation

May 7, 2026

Two communities of Kherson region receive new status

Director of the occupation lyceum in Kherson was sentenced to 12 years in prison

A soldier from Kherson region, who came out of occupation, became a Hero of Ukraine

MFA reports critical humanitarian situation in occupied Kherson region