26 January 2025

Kherson Oblast seeks over 33 million for construction of rural outpatient clinic

(Photo: Dream)

A general family medicine outpatient clinic is planned to be built in the village of Davydiv Brid in Kherson Oblast. The cost of the project is UAH 33.5 million, with UAH 21.9 million available.

The relevant announcement wasmade in the DREAM Digital Ecosystem by the Territorial Development Department of the Kherson Regional State Administration.

Photo: screenshot from DREAM

<span>The purpose of the construction of the facility is to provide modern conditions for medical staff. Accessibility of quality medical care for the local population.</span>

The project envisages the construction of a one-story outpatient clinic building that will meet modern standards of functionality, energy efficiency and inclusiveness. The building will be provided with all the necessary utilities, including water supply, sewage, electricity, heating, ventilation and fire protection.

The outpatient clinic is to be equipped with doctors' offices, a treatment room and a vaccination room. In addition, a comfortable waiting area for patients will be created. There is also the possibility of installing solar panels to partially meet energy needs and a rainwater collection system for technical needs.

The total cost of the project is UAH 33.5 million. The European Investment Bank agreed to provide UAH 21.3 million.

Photo: screenshot from DREAM

Earlier, the Verkhnorohachytsia village council announced its intention to purchase a set of equipment and a car for the mobile ASC. They plan to spend a little over UAH 1 million. And the Kherson Regional Hospital for Rehabilitation has announced the creation of a 30-bedMental Health Unit. The arrangement of which can cost the budget 11 million hryvnias. At the same time, the hospital itself can allocate only 93 thousand hryvnias out of 11 million.

In total, since the beginning of the year, 11 facilities have been added to the DREAM Digital Ecosystem for Accountable Recovery Management, which are planned to be restored in 2025. At the same time, the cost has been calculated for only two reconstruction projects: the repair of the Mental Health Unit and the reconstruction of the Vysokopil Lyceum building.

Олеся Ланцман

You may also like:

Sept. 9, 2026

The Kherson City Council has projected a loss of one-third of the city budget without subsidies

Sept. 8, 2026

A Historical Landscape or a New Ecosystem: What Is Taking Shape at the Bottom of the Kakhovka Reservoir

Residents of Kherson are flocking to Mykolaiv in search of housing: prices have risen to 25,000

"We're taking money from children": A dispute over 38 million broke out in Odesa

Occupiers struck a market in the Kherson region with a drone: one person was injured

Sept. 7, 2026

The Ochakiv Lyceum Spent 720,000 on Furniture for a Shelter Without a Bidding Process

Ukrainian porcelain was exhibited at the Voznesensk Museum

In the occupied Kherson region, Russian documents are left pending for months

Nearly 5 million was spent on stabilizing a landslide-prone slope in Odesa

The enemy shelled 28 settlements in the Kherson region

Sept. 6, 2026

A major road construction company in the Kherson region was awarded a 14-million contract to repair a road without any competition

Police showed the damaged train following the attack in Chornobaivka

Occupiers struck a high-rise building in Kherson: a family was injured

Sept. 5, 2026

The Kherson authorities have called for children to be evacuated to safer regions

Ukraine's representative to the UN issued a statement regarding a new map that excludes Crimea and the Kherson region