Intent logo

March 23, 2025, 6:27 p.m.

Mykolaiv Region Allocates ₴12.7M for Overhaul of Art School Damaged by Russian Shelling

PHOTO: Welfare.green

(PHOTO: Welfare.green)

Mykolaiv region has planned to overhaul the Bereznehuvata Art School, which was damaged by Russian shelling. More than UAH 12 million has been allocated for this purpose.

This is according to the Prozorro electronic public procurement system.

In the village of Berezneguvate, Bashtanka district, Mykolaiv region, a major overhaul of the local art school will begin. According to the announcement, the expected cost of the work is UAH 12 million 709 thousand 209.

The project involves final construction works, and the repair should be completed by December 31, 2026.

Potential contractors have until April 3, 2025 to submit their bids, and the auction is scheduled for the same day. The minimum price reduction step is UAH 63 thousand 546.

Screenshot: Prozorro

The overhaul work will be carried out gradually, with payments for the completed stages made upon their completion. This overhaul will be an important step in improving the educational infrastructure in the region and will create comfortable conditions for students and teachers.

The selected contractor must confirm the availability of the material and technical base, employees with appropriate qualifications and similar experience. The<span>warranty period should be 10 years from the date of signing the act by the parties </span>.

Mykolaiv has also announced a tender for the overhaul of administrative buildings of a local utility company, for which it plans to spend more than UAH 15 million. The works will include the repair of an administrative and utility building, a production building, a garage box and an administrative building with garage boxes. The customer is the Self-Supporting Construction Mechanization Section.

In addition, a major overhaul of a part of the water supply system in the city of Novyi Buh, Mykolaiv region, worth UAH 11.45 million is envisaged. The contractor is to carry out general construction works, install heating, sewerage and water supply systems, as well as electric lighting and lightning protection.

Анна Бальчінос

You might also like:

March 25, 2025

Murakhivka Lyceum Repair Costs Surge by ₴6.58M After Russian Shelling

March 17, 2025

Mykolaiv Allocates ₴2.8M for Road Repairs on Khristo Botieva Street

March 14, 2025

Mykolaiv Announces ₴15.6M Tender for Administrative Building Overhaul

March 20, 2025

Mykolaiv to Reconstruct Water Supply Network on Budivelnykiv Street for ₴3.2M

March 13, 2025

Mykolaiv Allocates ₴60M for Boiler House Reconstruction Tender

March 22, 2025

₴170 Million Planned for Public Road Maintenance in Beryslav, Kherson

March 23, 2025

Ukraine Approves 68 Water Supply Projects Worth ₴2 Billion for Recovery

March 25, 2025

Kherson District Allocates ₴70M for Urgent Road Repairs and Maintenance

March 23, 2025

Mykolaiv Regional Clinical Hospital Spends Over ₴20M on Medical Services in 2025

March 22, 2025

Odesa's Bilyayivka Lyceum No. 3 Reconstruction Tender Set for ₴155.5M

March 17, 2025

Mykolaiv's 2024 Urban Planning Projects Exceed ₴1.5 Billion in Spending

March 18, 2025

Pivdenoukrainsk Lyceum No. 5 to Repair Mini Football Field for ₴983,788

March 21, 2025

Mykolaiv Allocates ₴4.1M for Boiler House Reconstruction with Gas Cogeneration Unit

March 20, 2025

Nova Kamianka to Build ₴96.3M Administrative Center in Kherson Region

March 16, 2025

Mykolaiv Allocates ₴5M for Electricity Tender to Illuminate City Streets