Sept. 10, 2024, 5:31 p.m.

Eight new wells are planned to be drilled in Kherson region for almost UAH 40 million

(Photo: Ukrinform)

In Kherson region, eight artesian wells are planned to be drilled to provide water supply to the Novoraysk territorial community (Novoraysk, Chervonyi Mayak).

The corresponding tender was published on the Prozorro portal.

The customer was the Territorial Development Department of the Kherson Regional State Administration. It is ready to pay UAH 38 million 999 thousand 394 including VAT for eight wells (excluding supervision).

According to the terms of the tender, the customer has to carry out the construction of eight artesian wells to provide water supply to the Novoraysk territorial community in the villages of Novoraysk and Chervonyi Mayak.


Photo: Prozorro screenshot

The tender was announced on September 5. Applicants have until September 17 to challenge the terms of the tender and seek clarification. The deadline for submitting bids is September 20. The auction is scheduled for September 23. Work completion date: December 25, 2025.

Earlier it was reported that in the Kherson region in Vysokopillya, it is planned to overhaul the building of the Vysokopillya Secondary Education Institution with the construction of a protective structure on the territory of the educational institution. The customer, the Department of Territory Development of the Kherson Regional State Administration, proposed to overhaul the school and build a protective structure on its territory in almost two years (until December 25, 2025) for UAH 134 million 092 thousand 240.8.

Also in Kherson region, a separate unit of the South Ukrainian Hydrogeological Expedition of the State Enterprise Ukrainian Geological Company will conduct supervision of drilling five wells in Beryslav district for UAH 100 thousand.

You might also like:

Jan. 29, 2026

A bomber was shot down over the Black Sea during an attack on Odesa region

Jan. 28, 2026

Kivalov Odesa Law Academy ordered media advertising from a regular contractor

Jan. 27, 2026

Mobilization in 2026: changes in booking rules and emphasis on digitalization

Jan. 26, 2026

Part of a house destroyed by shelling is being dismantled in Mykolaiv

In Kherson, UNICEF-funded contracts went to companies with criminal records

Environmental damage to Odesa and Mykolaiv regions from the war reached 484 billion

Odesa planetarium lost windows and doors as a result of shelling, but is still operating

Enemy propaganda in Crimea turned children into war criminals

Jan. 25, 2026

Environmentalist says beach season in Odesa may be disrupted by sea pollution

Odesa terminates agreement with businessman involved in journalistic investigation

Odesa court sentences Kherson resident to 10 years for collaboration

A company with an abnormally cheap offer was chosen to maintain fire protection systems in schools in Odesa

Jan. 24, 2026

Richelieu Lyceum in Odesa chose a breadwinner for students without an auction

Odesa resident beaten by TCC fighters says he has no complaints against them

Prymorskyi district of Odesa left without water supply due to accident