May 4, 2025, 9:16 p.m.

The municipal utility responsible for beaches in Odesa decided to purchase a mobile shelter

(Photo: Hromadske)

Odesa City Council's municipal enterprise Coast of Odesa has announced a tender to select a supplier of primary (mobile) shelter with delivery and installation.

The announcement was published in the Prozorro electronic procurement system.

The procurement is scheduled for May 12 in the format of an open tender with the expected purchase price of UAH 3.5 million. It is a mobile shelter with a capacity of 50 people - 46 seats and four seats for people in wheelchairs. The seats are calculated from the following parameters: the width of a wheelchair is 0.8 meters, the length is 1.2 meters. There should be a possibility to maneuver a wheelchair with an area of 1.5 meters by 1.5 meters near the shelter installation site.

The winning company will have to install the shelter by May 31. The structure must have protection against the effects of excessive pressure in the front of the air shock wave of at least 100 kPa. The shelter should consist of four block modules that form the main shelter room and two block modules of vestibules with an exit. The vestibules with exits are located at opposite ends of the structure.

Earlier, Odesa decided to expand the Dolphin beach area and create special infrastructure for people with disabilities. The Department of Engineering Protection of the City Territory and Coastal Development was officially appointed as the customer for the design and reconstruction of this beach. As Mayor Hennadii Trukhanov explained, the main goal of the project is to create an accessible space for all categories of citizens, including people with disabilities and veterans.

Preparations for the opening of the beach season are underway in Odesa Oblast. This year, the authorities plan to open 48 beaches for vacationers. For comparison, in 2024, the number of beaches for vacationers was more than 2.5 times less - 20. The beach at the 11th station of the Big Fountain is also being equipped.

Intent wrote that in 2025, Odesa will not open an inclusive beach on Luzanivka. The reason is that the military did not approve its opening.

Кирило Бойко

You might also like:

Dec. 17, 2025

In Odesa, 168 million planned for hospital shelter

The newly created company received the contract of the National Police of Odesa region without competition

How Odesa is preparing infrastructure for blackouts: Intent.Insight analyzed the world's experience

State of emergency declared in Odesa due to power system

Odesa City Council Spent Billions on Loan Interest

Unauthorized construction on Pirogovsky Lane dismantled in Odesa

The case of returning the yacht club in Odesa to the state was put on hold

Head of NGO sentenced in Odesa for calling for coup

Russian Drones Damage Transport Infrastructure in Odesa Region

In Odesa, a man tried to avoid conscription by self-mutilation

Power supply restored to over 225 thousand families in Odesa region

Dec. 16, 2025

Odesa court bans public organization of fugitive MP Markov

Dmytro Velychko appointed to head the Department of Culture in Odesa

A city in Germany named a street in honor of Odesa

Tenth DECIDE career guidance hub opened in Odesa region