Jan. 24, 2025, 7:58 p.m.

Roofing repairs at a lyceum in Mykolaiv region cost 17 million

(PHOTO: South Ukrainian Professional Lyceum/Facebook)

In Mykolaiv region, it is planned to repair the roof of a college, the condition of which threatens the safety of students and staff. UAH 17 million is to be raised for this purpose.

This was reported by the Center for Public Investigations with reference to the Dream ecosystem.

It is planned to overhaul the roof of the South Ukrainian Vocational Lyceum.

One of the main reasons for the overhaul is the leakage of the roof, which poses a serious danger to students and staff. Water leaks can lead to the destruction of building structures, short circuits in electrical wiring, and even injuries to students. The roof had reached the end of its service life, and its deterioration caused damage during snow and ice removal.

Screenshot: Dream

According to the project description, the main goal of the project is to improve the conditions for learning and working. Restoring the roof allows not only to preserve the building but also to create safe conditions for students and teachers, reducing the incidence of illness and injuries.

The estimated duration of the repair is 24 months.

The total estimated budget of the project is UAH 17 million. The renovation is scheduled to be completed by the end of 2025, which will update the building and improve the learning environment for the lyceum's students.

Screenshot: Dream

The project is currently underway and requires funding.

It is also planned to repair the shelter and the building of the Kobzartsivska elementary school with a preschool unit. The shelter will be accessible not only to students and staff of the school, but also to all villagers. To implement this project, we need to raise more than UAH 25 million. The main goal is to create conditions for full-time education and provide safe shelter for community members in case of emergencies.

In addition, it is planned to overhaul the protective structure of Kryvoozersky Lyceum No. 1. The local budget has already allocated almost one million hryvnias out of the required nine. The project is aimed at ensuring a continuous educational process in the format of full-time education even under martial law.

Анна Бальчінос

Також Вам може сподобатись:

March 11, 2026

High-profile case in Mykolaiv: former SSO commander denies high treason

Water distribution points will be temporarily suspended in Mykolaiv: the reason is given

Mykolaiv to sell 48 million tons of sludge

Hundreds of millions and crime: what the reconstruction of a special school in Odesa has revealed

Drones with video communication: Russia modernizes attacks on southern Ukraine

March 10, 2026

Profiteering from farmers: ex-officials of the State Service of Ukraine for Food Safety and Consumer Protection from Mykolaiv region will be tried for bribery

March 9, 2026

Mykolaiv investigates booking scheme through sports schools

Mykolaiv region opens accounts on corruption at checkpoints of invincibility

Kherson police officer served suspicion notice for license fraud

Mykolaiv City Council Decides on Date for Continuation of Session: Privatization and Restoration

A resident of Kherson region was imposed house arrest for calling for the continuation of his

March 8, 2026

An employee of Ukrzaliznytsia complained to the TCC and the police in Mykolaiv region: what the court decided

March 7, 2026

An architectural monument damaged by shelling in Mykolaiv was preserved for restoration

Mykolaiv invests 31 million in development of new city master plan

March 6, 2026

Mykolaiv to receive dozens of trams from Europe