March 12, 2026, 10:20 a.m.

A popular tram route in Mykolaiv was shut down due to CHP works

(Photo: Mykolaiv City Council)

On Thursday, March 12, starting at 9:00 a.m., tram No. 11 will be temporarily suspended in both directions in Mykolaiv. The restriction is due to repair work being carried out by Mykolaiv CHP.

According to the press service of the Mykolaiv City Council, the work will completely block the traffic on this route. It will be known when the trams will resume running after the work is completed - this will be announced later.

Residents and guests of the city are asked to take into account temporary changes in the operation of public transport and plan their trips in advance.

Earlier, Intent wrote that Mykolaiv would receive 40 tramcars from the Swedish city of Gothenburg. These are M29 trams, which were previously used in the Swedish urban transportation system.

As a reminder, in December 2025, tram service was resumed in Mykolaiv on the route No. 3 ChSZ - 10th Military. Electric vehicles are running again according to their usual schedule.

Earlier in September, tram traffic in Mykolaiv was stopped for more than 400 minutes due to improperly parked cars blocking the tracks. The utility company emphasizes that irresponsible parking creates significant inconvenience to passengers and urges car drivers to be careful not to block public transportation.

The company reminded about the fines for the downtime of electric vehicles due to violation of parking rules:

UAH 1692 for a tram idle time;

UAH 1794 for a trolleybus idling.

Earlier, we reported on a case where a driver was fined over six thousand hryvnias for insufficiently tight parking, which blocked tram traffic in the center of Mykolaiv.

In particular, the city has initiated the reconstruction of the outdated rail and sleeper system. The project covers the renovation of almost 70 kilometers of tram tracks.

The project envisages the renovation of 69.6 km of tram tracks, most of which have been in operation since the 1970s. According to the description, the old rails and sleepers have already reached the end of their standard service life, which increases the risk of derailments, deforms tram bodies, increases noise and vibrations in nearby buildings, and increases the cost of emergency repairs.

The reconstruction includes the dismantling of dangerous sections, the arrangement of a ballast prism, the installation of modern rail and sleeper grids and switches, and the improvement of the roadway.

Андрій Колісніченко

Також Вам може сподобатись:

April 24, 2026

There are 170 millionaires in Mykolaiv region

Court blocks investigation into corruption in Mykolaiv region

Mykolaiv Mayor Earned UAH 10 Million for the Year

People's deputies accused of enrichment from Mykolaiv region purchased new real estate

April 23, 2026

A new trolleybus route will be launched in Mykolaiv by the end of April

A new payment format in electric transport has been introduced in Mykolaiv

District court arsonist convicted in Mykolaiv

One wounded after attack on power facility in Mykolaiv region

Mykolaiv has updated its budget and allocated tens of millions for defense

April 22, 2026

The cost of waste disposal will increase in Mykolaiv from May

Poor mayors, rich wives: what do the declarations of Mykolaiv oblast mayors look like?

Children hospitalized in Mykolaiv due to infection outbreak in kindergarten

Public transportation fares have been raised in Mykolaiv

In Mykolaiv, vandals destroyed flower beds: some flowers disappeared

April 21, 2026

Mykolaiv actor to star in Netflix anime adaptation