June 29, 2025, 6:26 p.m.

The boiler that heated the elephant house in the Odesa Zoo failed

(Photo collage: Intent)

The solid fuel boiler that heated the elephant sanctuary, the administrative building and a dozen other animal facilities, and now the city council plans to allocate UAH 5 million to replace it.

This was reported by Anastasia Bolshedvorova, a deputy of the Odesa City Council.

According to her, the boiler broke down at the end of the heating season.

"Together with a group of experts, we tried for a long time to see the year of manufacture on the boiler door," the deputy emphasized.

In his turn, the zoo director Ihor Belyakov said that the boiler was very important for the zoo's work and it was the largest in the zoo.

"It was used to supply heat to the elephant house, to the room for keepers, and to the winter room for parrots. It was a very important boiler and the largest in the zoo," the director said.

In May, Odesa Mayor Gennadiy Trukhanov ordered the creation of a working group to inspect the conditions and places of keeping animals in the Odesa Zoological Park of national importance. This was preceded by demands from the deputies caused by a lack of understanding of what was happening in the zoo.

In December 2024, Anastasia Bolshedvorova stated that she had sent a request to the zoo management about the causes of the animals' deaths, and some of the results surprised her. In particular, information about a squirrel that died from a fall. The very fact of the squirrel's strange death caused the deputy's distrust, and the mayor's joking suggestion that she go and investigate this fact and the assumption that the squirrel committed suicide caused almost hysterical l aughter among the deputies. In response, zoo director Igor Belyakov said that the squirrel died as a result of an accident.

On September 23, 2022, the Odesa Zoo celebrated its 100th anniversary .

As explained by the Odesa City Hall, before the full-scale invasion, the city had a targeted program to restore the zoo. The first stage of its implementation was the relocation of the entrance group from the roadway to Preobrazhenskyi Park. However, the war halted further work, including the construction of modern, spacious enclosures.

Кирило Бойко

You might also like:

Dec. 5, 2025

Public hearings on the draft city budget held in Odesa

Odesa National Library is included in the UNESCO list

Odesa region lost a statesman Ivan the Great

Displaced person from Kherson is sentenced for sabotage in Odesa

Dec. 4, 2025

New Deputy Mayor for Social Protection and Investments appointed in Odesa

A scandal erupts in Odesa over non-transparent reconstruction of elevators

Odesa Regional Council gets rid of two deputies ahead of schedule

In the case of the fire in the College of Economics and Law in Odesa, the interrogation of witnesses has begun

Odesa City Council Executive Committee to consider redistribution of investments and anti-corruption changes

Director of regional medical center fired in Odesa

Director of dolphinarium arrested in Odesa for construction on Lanzheron

DIU intelligence blocked sanatorium of businessmen from Odesa in Koncha Zaspa

Night attack in Odesa damages houses and injures 7 people

Dec. 3, 2025

Galanternik hired a law firm to force journalists to remove articles

Explosion occurs in Odesa high-rise building