Dec. 30, 2025, 1:19 p.m.

150 playgrounds to be repaired in Mykolaiv in the new year

(A playground in Mykolaiv. PHOTOS: ShoTam)

In 2026, Mykolaiv is planning a large-scale renovation of its leisure infrastructure: the Pilot utility company intends to carry out maintenance of at least 150 children's and sports grounds.

This was announced by the director of Pilot Utility Company Igor Golovaty during a meeting of the city council's planning and budget committee.

This initiative is aimed at restoring facilities that have not been properly maintained or damaged for a long time to ensure safe conditions for active recreation for citizens.

The amount was formed based on an analysis of the actual scope of work in previous years, as the number of sites in need of maintenance is growing every year. In addition to repairing the existing facilities, the allocated funding will allow us to purchase a limited number of new play elements, such as slides, sandboxes and balancers. However, the company's key strategy remains to maximize budgetary savings by developing its own production.

According to Ihor Holovaty, Pilot tries to manufacture most parts and equipment in-house. This allows not only to reduce the total cost of work, but also to respond quickly to damage without waiting for lengthy tender procedures for each individual element. This approach should ensure a steady pace of work in 2026 so that the number of repaired sites is no less than in previous periods.

Earlier, in the village of Lepetykha, Mykolaiv Oblast, the Department of Education, Culture, Youth and Sports of the Bereznehuvata Village Council planned to restore the lyceum that was previously damaged by Russia. UAH 30.4 million is to be allocated for the work.

The educational building No. 1 of the Lepety Lyceum was heavily damaged, despite the fact that its foundations, made of rubble stone, remained intact. The basement of the building has significant partial fractures, rashes, peeling plaster coating and cracks. The exterior walls have been partially destroyed, with masonry rows delaminated and the textured exterior decorative layer peeling off.

Катерина Глушко

Також Вам може сподобатись:

March 9, 2026

Mykolaiv investigates booking scheme through sports schools

Mykolaiv region opens accounts on corruption at checkpoints of invincibility

Kherson police officer served suspicion notice for license fraud

Mykolaiv City Council Decides on Date for Continuation of Session: Privatization and Restoration

A resident of Kherson region was imposed house arrest for calling for the continuation of his

March 8, 2026

An employee of Ukrzaliznytsia complained to the TCC and the police in Mykolaiv region: what the court decided

March 7, 2026

An architectural monument damaged by shelling in Mykolaiv was preserved for restoration

Mykolaiv invests 31 million in development of new city master plan

March 6, 2026

Mykolaiv to receive dozens of trams from Europe

Reconstruction of a school in the center of Mykolaiv will cost almost 265 million

14 million allocated for reconstruction in Izmail

March 5, 2026

Mykolaiv region plans to allocate 4 million for the Walk of Fame

Director of forestry in Mykolaiv region sows forest with crops

Competitors appealed the dubious victory in the tender of the deputy from Mykolaiv

Head of hromada in Mykolaiv region 'heated' budget funds on generators