April 14, 2025, 5:06 p.m.

Mykolaiv Plans ₴16.8M Apartment Building Restoration After Russian Shelling

(PHOTO: DREAM)

Mykolaiv plans to restore an apartment building damaged by Russian shelling. The project with a budget of more than 16 million provides for structural reinforcement and overhaul, but funding has not yet been secured.

This was reported by the Center for Public Investigations with reference to the DREAM ecosystem.

In Mykolaiv, it is planned to restore an apartment building on Yantarna Street, which was severely damaged by Russian shelling. The goal of the project is to restore the integrity of the facility for further safe operation and return of residents to their homes.

Screenshot: DREAM

According to the results of the technical inspection, the building's load-bearing walls, floor slabs, basement structures, and loggias were damaged, so it is currently uninhabitable.

The project requires UAH 16.8 million, of which UAH 2.8 million is for design and the rest for construction. Funding has not yet been confirmed, but the project is of great social and economic importance: it will allow residents to return to their homes and restore the building's safe operation.

The overhaul project already has approved design and estimate documentation, has passed environmental certification, and is included in the Unified Project Portfolio. The work involves strengthening structures, replacing damaged elements, and updating power supply systems.

Screenshot: DREAM

The restoration is being carried out by the Department of Housing and Communal Services of the Mykolaiv City Council, and the balance sheet holder is the Yantarna 67 condominium association.

This is not the only residential building renovation project in the city. Mykolaiv also plans to turn an old house on Velyka Morska Street into modern housing, with more than UAH 143 million allocated for this purpose. The work will include renovation of coatings, landscaping, installation of energy-saving lighting, and landscaping.

Another large-scale project involves the reconstruction of a building on Khersonske Highway: with a budget of over UAH 200 million, they want to equip a public space on the roof, make the area comfortable, and implement inclusive solutions.

Анна Бальчінос

Також Вам може сподобатись:

March 11, 2026

Water distribution points will be temporarily suspended in Mykolaiv: the reason is given

Mykolaiv to sell 48 million tons of sludge

Hundreds of millions and crime: what the reconstruction of a special school in Odesa has revealed

Drones with video communication: Russia modernizes attacks on southern Ukraine

March 10, 2026

Profiteering from farmers: ex-officials of the State Service of Ukraine for Food Safety and Consumer Protection from Mykolaiv region will be tried for bribery

Deadly shelling in Kherson region: Russians kill a man and wound eight others

March 9, 2026

Mykolaiv investigates booking scheme through sports schools

Mykolaiv region opens accounts on corruption at checkpoints of invincibility

Kherson police officer served suspicion notice for license fraud

Mykolaiv City Council Decides on Date for Continuation of Session: Privatization and Restoration

A resident of Kherson region was imposed house arrest for calling for the continuation of his

March 8, 2026

An employee of Ukrzaliznytsia complained to the TCC and the police in Mykolaiv region: what the court decided

March 7, 2026

An architectural monument damaged by shelling in Mykolaiv was preserved for restoration

Mykolaiv invests 31 million in development of new city master plan

March 6, 2026

Mykolaiv to receive dozens of trams from Europe