Nov. 4, 2024, 6:54 p.m.

Medical facilities are being renovated in Kherson region

(Photo: Kherson Regional State Administration)

The renovation of medical facilities in Kherson region continues. Thus, in one of the hospitals in Kherson, work is being completed on the arrangement of a shelter.

This was reported by the press service of the Kherson Regional State Administration.

The post says that volunteers from the local branch of Dobrobat are helping to carry out the repairs. Now, instead of damp rooms, there are comfortable and modern wards for patients, as well as a small gym. The last stage was the renovation of the corridor. Volunteers painted metal structures and doors, and insulated pipes to create a comfortable and welcoming environment for patients and medical staff.


Photo: Kherson Regional Medical Association

Also, according to Oleksandr Prokudin, head of the Kherson Regional Military Administration, the outpatient clinic in Kyselivka was renovated. It serves the residents of the village and surrounding settlements. Both adults and children. Here you can get vaccinated, have your blood pressure measured, have your heart checked or have laboratory tests done - the medical facility has all the necessary equipment. In addition, the outpatient clinic has rooms for narrow specialists. Including a dentist. Volunteers of mobile medical teams also provide medical appointments. The premises have been thoroughly renovated. The roof, windows and doors were replaced, corridors and offices were renovated, new floors were laid, and lighting was replaced. All this created comfortable conditions for patients and medical staff. It is especially important that the needs of people with disabilities were taken into account.

The project was implemented with the support of ALIMA and Project HOPE, the International Medical Corps, and the International Organization for Migration in Ukraine.

Earlier it was reported that despite the difficult conditions, the Arkhangelsk outpatient clinic continues to serve the population of six surrounding villages. This is almost 1800 residents. Before the Russian invasion, a new building was built here, but it was not put into operation. Now the building has been damaged by shelling and needs serious repairs.

Володимир Шкаєв

You might also like:

April 2, 2025

Major Repairs Start on Kherson Secondary School Shelter with ₴17.4M Budget

April 4, 2025

Kherson School Plans ₴17.9M Autonomous Bomb Shelter for Safe Education

April 6, 2025

Tavriyske Launches ₴26.9M Water Supply Overhaul for 560 Residents

April 3, 2025

Mykolaiv Allocates ₴4M for 15-Story Building Repair Tender by April 15

April 5, 2025

Mykolaiv Region Seeks Contractor for ₴19M Radiation Shelter Overhaul

April 7, 2025

Pregnant Woman and Child Injured in Russian Shelling in Kherson

April 3, 2025

Kherson Region Boosts One-Time Assistance to ₴30K for War-Injured Children

April 6, 2025

Mykolaiv Hospital Allocates ₴692,200 for Modern Endoscope Equipment Auction

March 27, 2025

Kherson Plans ₴55.9M Underground Children's Hospital for Wartime Protection

April 8, 2025

Odesa Receives ₴358M State Subvention for Hospital Restorations

March 31, 2025

Major Repairs Begin on Kherson Apartment Building with ₴7.4M Budget

April 3, 2025

Reconstruction of Serhiivka's 9-Story Building Nears Completion After Russian Attack

March 30, 2025

Mykolaiv Hospital Secures ₴11M for Life-Saving Fire Alarm System

April 8, 2025

Russian Attacks on Kherson: 31 Settlements Hit, 9 Wounded in 24 Hours

April 2, 2025

Odesa Region Offers Support for Shelling Victims - How to Apply