Intent logo

March 26, 2025, 11:23 a.m.

Construction Begins on New Radiation Shelter for 450 in Kherson, ₴103.3M Budget

PHOTO: Dream

(PHOTO: Dream)

Construction of a new school radiation shelter has begun in Kherson. The structure is designed for 450 people and will ensure safety in case of emergencies. It is planned to raise more than UAH 100 million for this purpose.

This was reported by the Center for Public Investigations with reference to the DREAM ecosystem.

In Kherson, the construction of a new radiation shelter is starting on the territory of secondary school No. 46. This civil defense protective structure is being created to ensure the safety of students and staff in case of emergencies.

The planned structure has a total area of 1309.7 m² and can accommodate up to 450 people.

Screenshot: DREAM

The shelter will be equipped with ventilation, electrical and heating systems, special rooms for long-term stay of people, as well as sanitary facilities. Particular attention is paid to accessibility for people with limited mobility - convenient entrances and the ability to move freely inside the shelter are provided.

The total budget of the project is UAH 103.3 million, of which:

Screenshot: DREAM

Currently, the confirmed funding is UAH 810 thousand from the local budget, which is 0.78% of the total project amount. The project is in line with the strategic documents of the local level, in particular the Program of Economic and Social Development of the Kherson City Territorial Community for 2024.

The construction includes: construction of the main shelter building; construction and installation works; waterproofing and insulation of structures, installation of internal and external engineering networks and doors, and interior finishing works.

The balance holder and main customer is the Capital Construction Department of Kherson City Council. This facility is part of the overall program to strengthen the protection of civilians and is part of a set of measures aimed at improving the level of security in educational institutions.

A new administrative building is planned to be built in the village of Nova Kamianka. It will become the center of community management and service provision to residents, and the estimated budget of the project is UAH 96.3 million.

In addition, the Kherson region plans to create a centralized warning system that will provide prompt information to the population about possible threats and emergencies. This project is expected to receive over UAH 5 million in funding.

Анна Бальчінос

You might also like:

March 27, 2025

Kherson Plans ₴55.9M Underground Children's Hospital for Wartime Protection

March 28, 2025

Mykolaiv Region Plans ₴21.4M Bomb Shelter in Bashtanka Sports Complex

March 24, 2025

Kherson Oblast Launches ₴5.4M Centralized Warning System for Emergencies

March 20, 2025

Odesa District Plans ₴122M Radiation Shelter at Mayakivsky Lyceum

March 17, 2025

Kryvoozersky Lyceum No. 1 Starts ₴15M Overhaul for Safe Learning Environment

March 27, 2025

Mykolaiv Community Allocates ₴3.94M for Automated Warning System

March 20, 2025

Nova Kamianka to Build ₴96.3M Administrative Center in Kherson Region

March 27, 2025

Over 4,000 Mykolaiv Residents Trained in Civil Defense in 2024

March 28, 2025

Kherson Region Plans ₴50.8M Housing Restoration Amid Controversy

March 25, 2025

Murakhivka Lyceum Repair Costs Soar by ₴6.58M After Russian Shelling

March 27, 2025

Mykolaiv Allocates ₴5.17M for Education Program 2025-2027 Updates

March 28, 2025

Dobroslav Village Council Boosts Mobilization Training Funding by ₴4.2M

Director of Iveko-Bud Charged with Negligence Over UAH 15M School Project in Mykolaiv Region

March 26, 2025

Mykolaiv City Council to Address 102 Land Issues and Social Services Funding on February 27

March 29, 2025

Kherson's Parks Enterprise to Inventory 7.6 Hectares of Land for Development