May 9, 2025, 11:02 a.m.

Auditors start checking 182-million tender for road repairs in Kherson region

(PHOTO: Infrastructure Restoration and Development Service)

In Kherson region, Rostdorstroy won a UAH 160 million tender for road maintenance in Beryslav district. The agreement has already been signed, but auditors have found signs of irregularities and started official monitoring of the procurement.

This was reported by the Center for Public Investigations with reference to the Prozorro procurement system.

In early April 2025, the State Institution "Local Roads of Kherson Region" announced an open tender for the provision of services for the operational maintenance of public roads of local importance within the Beryslav district. The expected value of the procurement was UAH 182 million.

The auction was held on April 16. Two companies took part in the auction: Rostdorstroy LLC and Global Build Engineering LLC. Rostdorstroy submitted the lowest price offer of UAH 160 million, which is UAH 22 million less than the expected value. It was this company that was recognized as the winner of the tender.

Screenshot: Prozorro

On May 6, the state agency and Rostdorstroy LLC signed a contract for the work. However, less than two days later, on May 8, the Southern Office of the State Audit Service of Ukraine announced the start of monitoring of this procurement.

As stated in the official order of the State Audit Service, the basis for this decision was signs of violations of public procurement legislation identified in the course of analyzing information published in the Prozorro system. The monitoring covers the stages of contract conclusion and execution.

The relevant order was signed by Dmytro Krukovskyi, Head of the Southern Office of the State Audit Service in Kherson Oblast. Control over the inspection was entrusted to the Procurement Control Department, and the order itself has already been published in the electronic system.

Screenshot: Prozorro

According to the regulations, the results of the monitoring may lead to an order to eliminate violations or even to the termination of the contract if significant violations of the law are found.

In 2024, about 500 private companies received almost UAH 150.5 billion from the budget. Analysts of the Ukrainian online system YouControl found out which contractors received the most and which of them have political connections. In particular, Rostdorstroy, a company affiliated with the "Trust the Deeds" party of the mayor of Odesa, won tenders worth 7.6 billion hryvnias.

Анна Бальчінос

Також Вам може сподобатись:

March 30, 2026

Russian colonel accused of torturing Skadovsk mayor

Russian language teacher in Kherson region sentenced to prison

Hospital for the Russian army in a hospital: in Kherson region, a doctor was sentenced to 10 years in prison

From PhD to suspect: a teacher of a pseudo-university exposed in Kherson

Aggressor troops shell a factory and a monastery in Kherson region

Kherson region exposes scheme of draft evasion through custody

March 29, 2026

The administrative building in the Black Sea port will be repaired by the company that was of interest to investigators

Court ruling: Russia must curtail chess tournaments in occupation

Battle for Kherson region: occupants attacked but did not advance

Power outage and water supply interruptions in Kherson region

Occupants unleash drone terror in the south: dozens of attacks, one killed and one wounded

March 28, 2026

Sabotage, recruitment and attempted murder: a Russian curator and his accomplice from Kherson are suspected

MP from Kherson region sentenced to prison for business with occupiers

Enemy troops attack 25 civilian infrastructure facilities in Kherson region

Oleshky on the verge of survival: Ombudsman declares humanitarian catastrophe