Dec. 27, 2024, 12:28 p.m.

A new residential complex for IDPs is to be built in Mykolaiv region

(PHOTO: Dream)

Mykolaiv region decided to build a residential complex for internally displaced persons. It is planned to raise more than UAH 3 billion for this purpose.

This was reported by the Center for Public Investigations with reference to the Dream ecosystem.

A new construction of a residential apartment complex intended for temporary residence of internally displaced persons in the city of Pervomaisk is planned.

The purpose of the construction is to provide adequate living conditions for people who have lost their homes or had them seriously damaged due to hostilities.

Screenshot: Dream

The project was initiated by the Department of Urban Planning, Architecture, Capital Construction and Project Development of the Mykolaiv Regional State Administration. The Department of Housing and Communal Services of the Pervomaisk City Council was designated as the balance holder.

The project budget is UAH 3.3 billion. It is planned to spend UAH 1 billion 609 million 275 thousand 492 on the construction itself. UAH 359 million 302 thousand 566 will be spent on the purchase of equipment. Other capital expenditures will amount to UAH 1 billion 366 million 883 thousand 823.

Screenshot: Dream

The estimated construction period is 81 months. The construction project is in the implementation status and currently requires funding.

Planning for the construction began in 2022. According to Prozorro, UAH 10 million was allocated from the budget for the production of design and estimate documentation for the facility. The documentation was produced by Concord Project LLC.

Voznesensk also planned to convert a non-residential building into social housing for IDPs and people in difficult life circumstances. Seventy million hryvnias were allocated from the budget for this purpose. After reconstruction, the building will provide housing for 72 people.

Mykolaiv also plans to raise UAH 6 billion to build a water filtration system. The goal of the project is to provide the city with a stable and high-quality water supply through the construction of a pressure filtration system, which will improve the quality of drinking water and increase the reliability of water supply.

Анна Бальчінос

You might also like:

Dec. 13, 2025

Five people were wounded in shelling in Mykolaiv region

Electric transport operation in Mykolaiv restricted as a result of enemy attack

Dec. 12, 2025

MP's company wins 88 million to repair the bridge between Odesa and Mykolaiv

Girl commits suicide in Mykolaiv because of violence

3 billion planned for protection of cultural heritage in Mykolaiv

Dec. 11, 2025

What is the most delicious sushi in Odesa: TOP-3 rolls delivery Advertising

Dec. 10, 2025

Mykolaiv officials spent hundreds of thousands from the budget on foreign trips

Dec. 9, 2025

In Mykolaiv region, payroll records "forgot 4.5 million

Dec. 8, 2025

Construction of a social dormitory for 125 million was initiated in Kherson region

Two Faces of Europe: Helping Ukraine and the Aggressor

Mykolaiv athlete Sadurska sets new world record again

Tender for a new stage of water supply system construction announced in Mykolaiv

Russian informant sets 'video traps' for spying in Mykolaiv region

Dec. 7, 2025

UEFA fines Ukraine for banner about terrorist state

Company of former MP's assistant to repair premises for Odesa criminal experts