Feb. 9, 2025, 2:31 p.m.

40 Million UAH Project for Dual-Purpose Radiation Shelter at School

(Photo: DREAM)

A dual-purpose protective structure with the protective properties of a radiation shelter is planned to be built for 40 million hryvnias at the Novovoskresenska school with a preschool department.

According to the Center for Public Investigations, this became known from the digital ecosystem for accountable management of the DREAM recovery .

According to a fundraising announcement published on February 3 by the Humanitarian Affairs Department of the Novovorontsovo Village Council, the construction of the shelter will provide educational services for 25 preschool children and primary education for 56 schoolchildren. In addition, the educational institution is located more than 50 kilometers from the contact line, which will make it possible to organize a mixed form of education, taking into account the security situation.

The project envisages that the shelter will be equipped with two entrances and exits via stairwells and an elevator. At the entrances, there are rooms for changing clothes and storing contaminated clothing. The premises for preschoolers and students in grades 1-2 should be divided into a zone for rest and sleep, a zone for eating and classes, a play area, a zone for placing shoes and clothes, and a zone for adults. The premises for pupils in grades 3-4 should have an area for classes and meals, a play area, a shoe and clothing area, and an adult area. And the premises for students in grades 5-11 should have a classroom and dining area, a shoe and clothing area, and an adult area.

In addition, the working draft provides for free access to the storage facility for people with limited mobility - lowering the side stones on the pavement, the presence of ramps with a standard slope, no height differences at the entrance to the storage facility, with a door width of at least 0.9 m in cleanliness.

The total estimated budget of the project is UAH 40 million. The total amount of confirmed funding sources is still 0.

In total, since the beginning of the year, 11 sites have been added to the DREAM Digital Ecosystem for Accountable Recovery Management, which are planned to be restored in 2025. At the same time, the cost has been calculated for only two reconstruction projects: the repair of the Mental Health Unit and the reconstruction of the Vysokopil Lyceum building.

Олеся Ланцман

Також Вам може сподобатись:

April 5, 2026

A plan for recruitment to the Russian army has been set up in educational institutions in TOT

Honors, cups, and awards: what money is spent on in Kherson

Attacks near the bridge and the island: Ukrainian Armed Forces repel attacks in Kherson region

Trolleybus traffic stopped in the center of Kherson

Shelling of Kherson and Mykolaiv regions: dead, wounded, including a child

April 4, 2026

Mined lives: residents of Oleshky unite to collect information about the victims

Kyiv, Europe, and 30 days abroad: what was behind the Kherson region's head's business trips?

Only Odesa City Council did not answer how much it spent on the Defense Forces

Cabinet of Ministers appoints combat pilot as head of Kherson RSA

Occupants strike Kherson region with aerial bombs: 23 people wounded

Beaten with truncheons and kicked: occupation security forces exposed for torture in Kherson

April 3, 2026

Dead collaborator sentenced to life in Kherson

Former prosecutor from Kherson offered to head Odesa Port Plant

A deputy of one of Kherson district councils forgot about real estate worth 13 million

Walking with a dog in Kherson turned into transferring data about the Armed Forces to the enemy