Feb. 9, 2025, 2:31 p.m.

40 Million UAH Project for Dual-Purpose Radiation Shelter at School

(Photo: DREAM)

A dual-purpose protective structure with the protective properties of a radiation shelter is planned to be built for 40 million hryvnias at the Novovoskresenska school with a preschool department.

According to the Center for Public Investigations, this became known from the digital ecosystem for accountable management of the DREAM recovery .

According to a fundraising announcement published on February 3 by the Humanitarian Affairs Department of the Novovorontsovo Village Council, the construction of the shelter will provide educational services for 25 preschool children and primary education for 56 schoolchildren. In addition, the educational institution is located more than 50 kilometers from the contact line, which will make it possible to organize a mixed form of education, taking into account the security situation.

The project envisages that the shelter will be equipped with two entrances and exits via stairwells and an elevator. At the entrances, there are rooms for changing clothes and storing contaminated clothing. The premises for preschoolers and students in grades 1-2 should be divided into a zone for rest and sleep, a zone for eating and classes, a play area, a zone for placing shoes and clothes, and a zone for adults. The premises for pupils in grades 3-4 should have an area for classes and meals, a play area, a shoe and clothing area, and an adult area. And the premises for students in grades 5-11 should have a classroom and dining area, a shoe and clothing area, and an adult area.

In addition, the working draft provides for free access to the storage facility for people with limited mobility - lowering the side stones on the pavement, the presence of ramps with a standard slope, no height differences at the entrance to the storage facility, with a door width of at least 0.9 m in cleanliness.

The total estimated budget of the project is UAH 40 million. The total amount of confirmed funding sources is still 0.

In total, since the beginning of the year, 11 sites have been added to the DREAM Digital Ecosystem for Accountable Recovery Management, which are planned to be restored in 2025. At the same time, the cost has been calculated for only two reconstruction projects: the repair of the Mental Health Unit and the reconstruction of the Vysokopil Lyceum building.

Олеся Ланцман

You might also like:

Dec. 18, 2025

Odesa reveals inflated prices for repair of kindergarten shelter

Resident of Kherson region heads village council under occupants

Dec. 17, 2025

In Odesa, 168 million planned for hospital shelter

Dec. 16, 2025

Odesa court bans public organization of fugitive MP Markov

Kherson resident becomes head of administration under Russia

Dec. 15, 2025

Embezzlement in the construction of a kindergarten revealed in Kherson

Kherson resident attempted to kill four people and received 15 years in prison

Mykolaiv region selects contractor for construction of shelter for 86 million

Kherson police officer caught in scheme with fake driving school certificates

Head of a kindergarten in Kherson showed children Russian cartoons

Dec. 14, 2025

"Chornomorets receives a ban on transfers from FIFA

Dec. 13, 2025

Court clerk participated in repressions against abducted Kherson residents

Dec. 12, 2025

The court of the occupiers upheld the sentence of a journalist from Kherson region

Hundreds of millions planned for development of municipal infrastructure in Kherson

Exhibition about Kremlin prisoners opened in Kherson