Feb. 9, 2025, 2:31 p.m.

40 Million UAH Project for Dual-Purpose Radiation Shelter at School

(Photo: DREAM)

A dual-purpose protective structure with the protective properties of a radiation shelter is planned to be built for 40 million hryvnias at the Novovoskresenska school with a preschool department.

According to the Center for Public Investigations, this became known from the digital ecosystem for accountable management of the DREAM recovery .

According to a fundraising announcement published on February 3 by the Humanitarian Affairs Department of the Novovorontsovo Village Council, the construction of the shelter will provide educational services for 25 preschool children and primary education for 56 schoolchildren. In addition, the educational institution is located more than 50 kilometers from the contact line, which will make it possible to organize a mixed form of education, taking into account the security situation.

The project envisages that the shelter will be equipped with two entrances and exits via stairwells and an elevator. At the entrances, there are rooms for changing clothes and storing contaminated clothing. The premises for preschoolers and students in grades 1-2 should be divided into a zone for rest and sleep, a zone for eating and classes, a play area, a zone for placing shoes and clothes, and a zone for adults. The premises for pupils in grades 3-4 should have an area for classes and meals, a play area, a shoe and clothing area, and an adult area. And the premises for students in grades 5-11 should have a classroom and dining area, a shoe and clothing area, and an adult area.

In addition, the working draft provides for free access to the storage facility for people with limited mobility - lowering the side stones on the pavement, the presence of ramps with a standard slope, no height differences at the entrance to the storage facility, with a door width of at least 0.9 m in cleanliness.

The total estimated budget of the project is UAH 40 million. The total amount of confirmed funding sources is still 0.

In total, since the beginning of the year, 11 sites have been added to the DREAM Digital Ecosystem for Accountable Recovery Management, which are planned to be restored in 2025. At the same time, the cost has been calculated for only two reconstruction projects: the repair of the Mental Health Unit and the reconstruction of the Vysokopil Lyceum building.

Олеся Ланцман

Також Вам може сподобатись:

March 15, 2026

Ex-secretary of Kherson city council sentenced to 9 years for cooperation with occupiers

Kherson court sentences head of HQC for bribery

German Foundation donates heaters for Kherson residents

Kherson region after shelling: one dead, dozens wounded, children injured

March 14, 2026

Ex-inspector from Kherson persuaded police officers to join the enemy

Enemy troops attack outpatient clinic and school in Kherson region

March 13, 2026

Crimean resident delivers humanitarian aid to Russian army in Kherson region

Kherson colony sergeant gets 12 years in prison for collaboration with occupiers

March 12, 2026

Head of occupation administration from Crimea exposed in Kherson region

Ukrzaliznytsia suspends train traffic to Kherson region: what happened

Occupants launch new passport scheme for residents of Kherson region

One person killed and more than 20 wounded in Kherson region overnight

March 11, 2026

Gold worth UAH 8.5 million disappeared from Kherson pawnshops

Hundreds of millions and crime: what the reconstruction of a special school in Odesa has revealed

Russian drone hits minibus in Kherson: many wounded