Oct. 10, 2024, 3:58 p.m.

One hundred and fifty million for heat: Mykolaiv decided to install heating stations

(PHOTO: Target Management)

The city of Mykolaiv decided to install heating stations in two high-rise buildings. It is planned to spend almost UAH 150 million on this.

This was reported by the Center for Public Investigations with reference to the Dream ecosystem.

The initiator of the projects was the regional utility company Mykolaivoblteploenergo.

Thus, according to the ecosystem, it is planned to install individual heating stations in multi-storey residential buildings in the Namiv neighborhood and in the Korabelnyi district.

An individual heating point (IHP) is an autonomous unit that integrates into the building's heating system and allows for automatic regulation of heat supply depending on the actual needs of the building.

UAH 70.9 million has been allocated for the heat point in the Namiv neighborhood and UAH 78.3 million in the Korabelny district.

Each individual heat point includes the following components:

The main goals of the project are to increase the efficiency of the heating system, reduce heat losses, optimize heat consumption, improve the comfort of residents by individually adjusting the temperature in the house, and reduce the cost of maintenance and heating bills.

According to the project descriptions, it will take 24 months to install the heating stations. The projects are currently under preparation and await funding.

Mykolaiv also planned to build a complex that will provide the city with a backup source of heat. More than eight hundred million hryvnias have been allocated for the project. Thus, it is planned to build a biomass power generating complex to provide a backup source of heat for the boiler house of the Mykolaivoblteploenergo utility company.

In addition, a boiler house reconstruction is planned in Mykolaiv. The reconstruction was initiated by the Mykolaiv City Council. Mykolaivoblteploenergo is the project executor. The project cost is UAH 176 million. The project aims to improve energy efficiency, reliability and safety of heat supply, as well as reduce the environmental impact of the boiler house.

Recently, the city received 6 modular boiler houses from the Government of the Kingdom of Denmark. The assistance was provided to ensure that the upcoming heating season will be held in the context of a full-scale war without risks for the townspeople.

Анна Бальчінос

You might also like:

Oct. 28, 2024

The most expensive land plot in Mykolaiv region was put up for auction by the Land Bank

Odesa SBU selects company to replace windows in sanatorium damaged by Russians

Odesa resident detained for extortion of bribe from a person liable for military service

Mykolaiv State Bureau of Investigation plans to install video surveillance systems

Odesa Port Decides to Purchase Two Minivans from Kaufman Company Without an Auction

He spied for the enemy in 10 regions of Ukraine: SBU exposes Russian agent

Utility driver in Odesa convicted for publishing TCC's actions

Two occupation judges from Crimea are sentenced to 12 and 13 years

Zelenskyy submits Prosecutor General's resignation to Parliament

Two henchmen of Russians who ran occupation administrations in Kherson region will be tried

Mykolaiv region decided to build a bridge for 160 million

Another UAH 31 million is planned to be spent on road maintenance in Izmail district during the year

National Agency announces tender for asset management of Mykolaiv Agricultural Company

Loud in Crimea: air raid alert was announced in Sevastopol at night

USPA's Black Sea branch selected the Black Sea port as a service provider for 16 million without an auction