Oct. 10, 2024, 3:58 p.m.

One hundred and fifty million for heat: Mykolaiv decided to install heating stations

(PHOTO: Target Management)

The city of Mykolaiv decided to install heating stations in two high-rise buildings. It is planned to spend almost UAH 150 million on this.

This was reported by the Center for Public Investigations with reference to the Dream ecosystem.

The initiator of the projects was the regional utility company Mykolaivoblteploenergo.

Thus, according to the ecosystem, it is planned to install individual heating stations in multi-storey residential buildings in the Namiv neighborhood and in the Korabelnyi district.

An individual heating point (IHP) is an autonomous unit that integrates into the building's heating system and allows for automatic regulation of heat supply depending on the actual needs of the building.

UAH 70.9 million has been allocated for the heat point in the Namiv neighborhood and UAH 78.3 million in the Korabelny district.

Each individual heat point includes the following components:

The main goals of the project are to increase the efficiency of the heating system, reduce heat losses, optimize heat consumption, improve the comfort of residents by individually adjusting the temperature in the house, and reduce the cost of maintenance and heating bills.

According to the project descriptions, it will take 24 months to install the heating stations. The projects are currently under preparation and await funding.

Mykolaiv also planned to build a complex that will provide the city with a backup source of heat. More than eight hundred million hryvnias have been allocated for the project. Thus, it is planned to build a biomass power generating complex to provide a backup source of heat for the boiler house of the Mykolaivoblteploenergo utility company.

In addition, a boiler house reconstruction is planned in Mykolaiv. The reconstruction was initiated by the Mykolaiv City Council. Mykolaivoblteploenergo is the project executor. The project cost is UAH 176 million. The project aims to improve energy efficiency, reliability and safety of heat supply, as well as reduce the environmental impact of the boiler house.

Recently, the city received 6 modular boiler houses from the Government of the Kingdom of Denmark. The assistance was provided to ensure that the upcoming heating season will be held in the context of a full-scale war without risks for the townspeople.

Анна Бальчінос

You might also like:

Jan. 10, 2026

In Mykolaiv region, 100 million worth of goods disappeared from the company's warehouses

In Mykolaiv, 187 million for food in kindergartens was given to a company with a history of abuse

Reconstruction of the basement of a kindergarten in Kherson region was estimated at 135 million

Mykolaiv exposes scheme of conscript evasion through expert medical commissions

Pre-trial restraint imposed on woman in Mykolaiv for selling newborn child

Jan. 9, 2026

Mykolaiv deputies plan to appeal to the Verkhovna Rada on taxes

Agent of aggressor state gets 9 years in prison in Mykolaiv

Pervomaisk plans to attract 168 million in state subsidies for education

Mykolaiv region reveals overpayments in construction of shelter for children for 85 million

TCC official exposed in Mykolaiv for violence against conscripts

Jan. 8, 2026

Million-dollar corruption scheme organized at Mykolaiv power grid repair

Ukrainian business has rethought solar energy: from saving to survival Advertising

Mykolaiv region resident accuses TCC of kidnapping

Jan. 7, 2026

Mykolaiv lacks one billion in funding: city council appeals to the Government

Mykolaiv region: Police detain man for possession of weapons arsenal