April 7, 2025, 4:48 p.m.

Odesa City Council Awards ₴1.16M Contract for Inclusive Resource Center Overhaul

(Odesa Inclusive Resource Center No. 1. Photo: Odesa City Hall)

The Capital Construction Department of the Odesa City Council has conducted a tender to select a contractor who will be paid for the priority measures to overhaul and stabilize the foundations of the building of the Odesa Inclusive Resource Center No. 1.

This was reported in the Prozorro electronic procurement system.

The procurement was conducted in the format of open bidding with special features, and the only participant and winner was AB-Group Limited Liability Company, which hopes to receive UAH 1 million 161.9 thousand for the work.

According to the YouControl service, AB-Group Limited Liability Company was registered in 2011 and is owned by Iryna Repetska.

The municipal institution "Odesa Inclusive Resource Center No. 1" was established in 2018 to ensure the right of children with special educational needs aged two to 18 to receive preschool and general secondary education, including in vocational schools, by conducting a comprehensive psychological and pedagogical assessment of the child's development, providing psychological and pedagogical assistance and ensuring systematic qualified support (except for pupils of compensatory type preschools (nurseries), students of special education institutions).

The Center provides services to children with special educational needs who live (study) in the city of Odesa and children with special educational needs whose parents (one of the parents) or legal representative has applied to the Center for services due to the lack of an inclusive resource center at the child's place of residence.

Кирило Бойко

You might also like:

Jan. 8, 2026

Judge of Odesa Prymorskyi Court dismissed after NABU complaint

Ukrzaliznytsia resumes supplying cargo to the ports of Greater Odesa

Russian oil tanker attacked in the Black Sea near Turkey

Billions for roads, checkpoints and water pipes: how the Odesa Region Restoration Service spent money in 2025

Million-dollar corruption scheme organized at Mykolaiv power grid repair

Prosecutor's Office in Odesa refused to arrest transshipment complex

6 billion allocated for road safety in Odesa

Woman taken into custody in Odesa for working for enemy special services

Odesa Executive Committee decides on the fate of the City Garden and energy facilities

Smuggling of timber through forged certificates exposed in Odesa

Court allows return of Caravaggio painting to Odesa museum

Jan. 7, 2026

Projects to restore shelled buildings in Odesa were awarded to an entrepreneur with a business in the Donetsk region

Foreign vessel arrested in Odesa for delaying cargo delivery

"Odesa did not use its resources until 2022," Volodymyr Beglov

The enemy launched a missile and drone strike on the Black Sea and Southern ports: one person was killed