May 7, 2025, 3:23 p.m.

Kherson allocated tens of millions for the second time to repair water supply system: where did the budget funds go?

(PHOTO: DREAM)

Kherson is planning to overhaul the water supply system for the second time, having already spent more than UAH 8 million in 2021. However, there is no indication in the digital restoration system that the work had ever begun.

This was reported by the Center for Public Investigations with reference to the DREAM system.

Kherson has prepared a project for the overhaul of the water supply system from Ivan Bohun Street to the pumping station. The work should ensure a stable water supply for residents of the Shumensky district. The total length of the section to be repaired is 1.36 kilometers.

Screenshot: DREAM

The project is part of the Unified Project Portfolio and is part of the community and regional development strategy. The estimated cost of the water pipeline repair is UAH 15.4 million, of which UAH 11.2 million has already been confirmed from the state budget. The funding was provided as part of the subsidies for the areas affected by the full-scale war. The estimated duration of the project is 10 months.

The customer is the municipal utility company "Production Department of Water Supply and Sewerage of Kherson", and the implementation is coordinated by the Department of Municipal Economy of the Kherson City Council.

It turned out that this was not the first attempt to carry out construction and installation work on the facility. According to the list of investment programs and regional development projects of the Kherson Regional State Administration, this project was approved back in 2021.

Screenshot: List of investment programs

According to Prozorro, the tender was announced in October 2021. At that time, two companies took part in the bidding - Yugelectrocom LLC and Vinnytsia Project-Bud. The agreement was signed with Yugelectrocom LLC, whose offer was not the lowest. The work was to be completed by December 31, 2022, and more than 8 million was planned for the project.

<span><span><span><span><span><span><span><span><span><span><span></span></span></span></span></span></span></span></span></span></span></span>Screenshot: Prozorro

But DREAM does not even indicate that they have started. The project was to be implemented at the expense of the State Regional Development Fund in 2021 in the Kherson region. At the same time, the ecosystem data shows that an additional subsidy from the state budget to local budgets was received in 2024-2005. YouControl also states that the company has been paid for the repairs.

Screenshot: YouControl

What the 8 million sent to repair the water supply system back in 2021 was spent on remains a question.

In addition, a project to overhaul the water supply network has been launched in the village of Tavriyske, Kherson district. The total cost of the work is 26.9 million hryvnias, and so far more than 258 thousand hryvnias have been allocated from the local budget for the development of project documentation, so additional funding is needed to continue the work.

Анна Бальчінос

Також Вам може сподобатись:

April 6, 2026

Kherson region resident arrested for armed raids and squeezing property

Mother dies in Kherson due to enemy attack in front of her son

Tender for 60 million failed in Kherson region

Head of pawnshops in Kherson region to be tried for misappropriation of jewelry

Aggressors cover Kherson region with UAVs and drones: a policeman is killed

Russian fan from Kherson paid with apartment and car for propaganda

April 5, 2026

A plan for recruitment to the Russian army has been set up in educational institutions in TOT

Honors, cups, and awards: what money is spent on in Kherson

Attacks near the bridge and the island: Ukrainian Armed Forces repel attacks in Kherson region

Trolleybus traffic stopped in the center of Kherson

Shelling of Kherson and Mykolaiv regions: dead, wounded, including a child

April 4, 2026

Mined lives: residents of Oleshky unite to collect information about the victims

Reconstruction of boiler houses in Voznesensk was awarded to a contractor with a history of overpayments

Kyiv, Europe, and 30 days abroad: what was behind the Kherson region's head's business trips?

Only Odesa City Council did not answer how much it spent on the Defense Forces