22 May 2025

54 million allocated for restoration of Yuzhnobuhskyi bridge in Mykolaiv

(PHOTOS: Suspilne)

Mykolaiv has announced a tender for more than UAH 54 million to maintain the Pivdenobugskyi Bridge. The works are to be completed by the end of 2026, and the winner will be determined at the end of May.

This is according to the Prozorro procurement system.

The Service for Infrastructure Restoration and Development in Mykolaiv Oblast has announced a tender for the operational maintenance of the Pivdennyi Buh Bridge over the Pivdennyi Buh River. The bridge is a part of the M-14 Odesa-Melitopol-Novoazovsk national highway. The expected cost of the works is over UAH 54 million.

The second stage of works will include maintenance of bridge structures in spans 4-8. The task involves construction and installation services that are included in the classification "construction and maintenance of roads, communication lines, power lines, and leveling of surfaces."

Screenshot: Prozorro

Bids can be submitted until May 29, and the electronic auction is scheduled for May 30. The winner will have to ensure the fulfillment of the contract by providing a bank guarantee in the amount of 1% of the cost of the work. The works are to be completed by December 20, 2026.

The customer is the Service for Infrastructure Restoration and Development in Mykolaiv Oblast. Under the terms of the tender, an advance payment of up to 30% of the annual cost of the works is possible.

This is not the first tender for the maintenance of this bridge. At the end of April, the Restoration Service announced an auction for the operational maintenance of the Pivdenne Bug Bridge on the M-14 Odesa-Melitopol-Novoazovsk highway, stating that it was the first stage of construction.

Only one company, the European Road Construction Company, applied for the tender. Its offer was 257 thousand hryvnias lower than the expected cost, so it was this company that was awarded the contract to repair the bridge in Mykolaiv. This company has been repeatedly mentioned in journalistic investigations - it has been linked to numerous non-competitive contracts worth hundreds of millions of hryvnias.

Анна Літман

You may also like:

Sept. 10, 2026

Odessa's housing and communal services agencies purchased 60 million worth of cleaning equipment from a single company

A suicide bomber attacked the Mykolaiv Detention Center, causing evacuation problems

The Transformation of Marketing: Key Changes According to Lviv-Based Marketers at Digital Space Advertisement

An Odessa official will stand trial for electricity fraud

A young man from Mykolaiv was ordered to kill a well-known activist in the woods

Sept. 9, 2026

Competitor Price Scraping: What Data Does an Online Store Really Need? Advertisement

In the Odesa region, a winner was selected for a tender worth nearly 80 million with a complicated history

The Mykolaiv–Lviv train was half a day late

A combined attack in the Mykolaiv region claimed the life of a woman

Sept. 8, 2026

A confiscated apartment in a luxury residential complex in Odesa has been listed for 82 million

New air raid alert levels have been introduced in the Odesa and Mykolaiv regions

In Mykolaiv, the director of a blood transfusion center sold plasma at a loss

Residents of Kherson are flocking to Mykolaiv in search of housing: prices have risen to 25,000

Odessa-based contractors have agreed to spend more than 5 million on renovating the police station in Izmail

Sept. 7, 2026

The Ochakiv Lyceum Spent 720,000 on Furniture for a Shelter Without a Bidding Process