23 November 2026, 16:41
All boiler rooms in Odesa have been restarted, and water service has been restored
Ця стаття також доступна українською
PHOTO: Intent/AI
In Odesa, power has been restored to all critical infrastructure, the water supply, and boiler rooms after two days without power due to Russian strikes on the main power grids. Heat is gradually returning to residential buildings, hospitals, and educational institutions.
This was reported by First Deputy Mayor Oleksandr Filatov.
According to him, Russian attacks caused extensive damage to Ukrenergo’s main power lines, through which electricity is supplied to Odesa. Due to the damage, it was physically impossible to transmit electricity to the city for some time.
Currently, water supply and sewage systems have been fully restored in all districts of Odesa. All district and small boiler rooms have also been brought back online. Heat has already begun to reach hospitals, schools, kindergartens, other social facilities, and residential buildings.
Educational institutions where heating has been restored will operate as usual on November 24. Parents are advised to check directly with the school or kindergarten for information regarding its specific operating status.
Hospitals in Odesa did not suspend operations during the power outage and continue to admit patients as usual. They are supplied with water reserves and backup power sources.
Public transportation has also been organized in the city: 27 social buses have been deployed on routes to supplement tram and trolleybus service.
Read also:Large-scale power outages continueinOdesa due to constant attacks
In addition, about 300 “Resilience Points” are operating in Odesa, where residents can charge their cell phones and other devices. District administrations, in collaboration with mobile operators, are also connecting base stations to power sources to restore stable mobile service.
