16 February 2025

Mykolaiv Region to Invest ₴6M in Cultural Shelter Renovation

(PHOTO: Dream)

In Mykolaiv region, it is planned to equip a shelter in a house of culture. Almost 6 million hryvnias need to be raised for this purpose.

This was reported by the Center for Public Investigations with reference to the DREAM ecosystem.

In Voznesensk, major repairs of a temporary shelter located in the basement of the local house of culture at 22 Odeska Street are starting. The facility is aimed at modernizing and renovating the premises, which will provide protection for 483 people in case of emergencies.

The project aims to ensure the safety of the local population by restoring and strengthening the existing shelter to meet modern safety and security standards.

Screenshot: Dream

The overhaul includes a number of works

The total budget of the project is UAH 5.9 million, and the implementation will last 12 months.

Screenshot: Dream

The reconstruction was initiated by the Voznesensk City Council, the customer is the City House of Culture, and the Department of Housing and Capital Construction is the fund manager.

The facility is part of the Targeted Civil Protection Program of the Voznesensk Territorial Community for 2023-2027 and meets modern safety requirements. The project is being implemented by the Housing, Utilities and Capital Construction Department of Voznesensk City Council, and Voznesensk City Council is the balance holder.

The shelter will become one of the elements of the town's security infrastructure, as its restoration will allow the community residents to have reliable protection in case of emergencies.

In the village of Zelenyi Yar, Mykolaiv region, it is planned to overhaul the radiation shelter located in the basement of the local lyceum. The project provides for the creation of a modern and safe shelter that meets all civil protection standards, but additional funding is needed to implement it. So far, the local authorities have been able to allocate only 5% of the required UAH 14 million.

In addition, major repairs are planned for the building and shelter of the Kobzartsivska primary school with a preschool unit of the Snihuriv City Council. The shelter will be available not only for students and staff, but also for the villagers. The project requires more than UAH 25 million, which is currently being sought.

Анна Літман

You may also like:

Sept. 4, 2026

Kherson has allocated 400 million for the purchase of mobile shelters

Sept. 1, 2026

A company with no competitors was selected to renovate the swimming pools in Chornomorsk

Aug. 31, 2026

A new suspect has emerged in the case involving a cover-up at a kindergarten in Odesa

Aug. 30, 2026

The contract to repair five kilometers of road in the Mykolaiv region for half a billion was awarded to a company from Odesa

Almost all contracts for the reconstruction of hospitals in Odesa were awarded without competition

Aug. 28, 2026

Agricultural enterprises in the Mykolaiv region increased production by 30 percent

Housing construction in the Mykolaiv region has nearly doubled

Aug. 27, 2026

In the Mykolaiv region, nearly 94 percent of children will attend school in person or through a hybrid model

Officials from the Mykolaiv Capital Construction Department have been accused of colluding with a contractor

Aug. 24, 2026

A contractor with 50 lines of business could receive 54 million for shelters in Vysokopillia

Aug. 23, 2026

In the Mykolaiv region, residents of Vinnytsia were charged 129 million for road repairs

Aug. 22, 2026

A Day of Mourning for Those Killed in the Russian Attack Was Declared in Mykolaiv Oblast

Aug. 21, 2026

A company director in the Mykolaiv region was convicted of embezzlement in connection with road construction projects

A businessman from the Mykolaiv region has been charged with embezzlement and concealment

In the case involving millions in markups, police were granted access to a hideout in the Mykolaiv region