08 November 2025

Mykolaiv initiates reconstruction of school for 34 million

(Mykolaiv school No. 23. PHOTO: DREAM)

Mykolaiv initiated the reconstruction of a school. It is planned to raise more than UAH 30 million for insulation and modernization.

This was reported by Intent with reference to the DREAM ecosystem.

Mykolaiv is planning a large-scale reconstruction of the Mykolaiv secondary school Ⅰ-Ⅲ levels No. 23 at 10 Garzionna Street. The project involves thermal sanitation of the building and creation of comfortable and safe conditions for 350 students and 45 employees.

The works include insulation of the walls, basement and external slopes, replacement of windows and doors, insulation of the basement and attic floors, as well as reconstruction of heating and ventilation systems. It is planned to automate the heating station, install fire doors, inject cracks in the brick walls, and arrange drainage and snow guards on the roof. In addition, the building will be equipped with an elevator for people with limited mobility and the wings and canopies will be repaired.

SCREENSHOT: DREAM

The project also includes partial replacement of the floors with monolithic sections and vertical waterproofing of the foundations. All the work should improve the building's energy efficiency, reduce noise, and provide better lighting and ventilation.

The total cost of the project is UAH 34.2 million, and funding has not yet been confirmed. The work is scheduled to be completed in 2026.

The project was initiated by the Department of Energy, Energy Saving and Implementation of Innovative Technologies of the Mykolaiv City Council. The school building is designed for 350 students and 45 employees, has three floors, reinforced concrete panels and a pitched roof covered with corrugated board.

The project is part of the Unified Project Portfolio (UPP) and aims to improve the quality of the environment, comfortable learning conditions, and energy savings.

The Novofedorivsky Lyceum is also working on repairing a radiation shelter. The reconstruction of a bomb shelter for children in Mykolaiv region is being carried out by a company known for its proximity to local authorities. Although no legal proceedings have been opened against the company, it has already been the subject of journalistic investigations. In particular, the company had previously carried out work on the arrangement of a shelter in the Berezanka school, but during heavy rain the premises were flooded.

Анна Бальчінос

You may also like:

May 27, 2026

Cash, real estate and wife's business: what rectors of Kherson and Mykolaiv declare

In Mykolaiv region, ex-director of a utility company did not file declarations for years

The Ministry of Economy explains why the sale of Mykolaiv Alumina Plant is delayed

Mykolaiv to consider support for the military, dismantling of kiosks and new rules for electric transport

May 26, 2026

In Mykolaiv and Kherson, builders and dentists are paid the most

Mykolaiv plans to reallocate UNDP aid by 11 million

Mykolaiv plans to raise tariffs for recycling of demolition waste

In Mykolaiv region, 22 people were poisoned after a memorial dinner

May 25, 2026

Court unblocks accounts and equipment of agricultural company in Mykolaiv region in raiding case

Mykolaiv region is among the outsiders in courts on employment of people with disabilities

Court keeps equipment under arrest in Mykolaiv money laundering case

In Mykolaiv, a company with schemes can get 89 million for the Yuzhnobuzkyi Bridge

Director of agricultural firm sent to prison in Mykolaiv for supplying grain to occupiers

Beaten, spat in the face and filmed: a schoolgirl was punished for bullying in Pervomaisk

May 24, 2026

Mykolayivvodokanal names the most scarce professions