May 20, 2025, 4:44 p.m.

Mykolaiv plans large-scale reconstruction of Victory Park

(Photo: Dream)

Mykolaiv is planning to carry out a large-scale reconstruction of the local landscape art park, Peremohy Park. Currently, local authorities are looking for funds in the amount of over UAH 160 million.

Information about the project has been published in the DREAM ecosystem.

The initiative is being implemented by the Department of Housing and Communal Services of Mykolaiv City Council.

Photo: DREAM

The object is included in the register of the nature reserve fund of the region, and its boundaries were approved by the city council in 2008. The territory is subject to restrictions related to its nature conservation status, so only activities aimed at preserving and maintaining the park'sfunctioning are allowed.

According to the project, it is planned to preserve the existing spatial structure of the park, improve the beach area, arrange bicycle paths, place fountains, decorative ponds, food facilities, lighting, video surveillance, and watering systems. It also provides for the creation of an accessible environment for people with limited mobility.

According to MikVisti, the architectural concept of the complex was developed by the Italian company One Works. The facilities are planned to be located on the lower embankment, on the left bank of the Ingul River, near the pedestrian bridge.

The complex will consist of two buildings: in the west, the Water Palace with a multipurpose hall, offices of the Mykolaiv Maritime Assembly, educational spaces and ticket sales points; in the east, the School of Young Seafarers with classrooms for 160 students. Both buildings will be connected by a suspended terrace. The total area of the complex is 2350 m². The estimated cost of the project is UAH 164.5 million.

DREAM was established and operates in accordance with the Resolution of the Cabinet of Ministers of Ukraine No. 1286 of November 15, 2022. Since the beginning of the full-scale invasion of Russia, almost 3,000 infrastructure facilities have been damaged in the Mykolaiv region.

On February 25, 2022, the first energy facilities were damaged, and on February 26, the first residential facilities were damaged. In early March, on the 2nd, it was already gas/water/heat supply facilities.

Critical infrastructure facilities became the first target of the Russians since the beginning of the full-scale war. Developing a set of measures to protect such facilities is a priority for the authorities.

Mykolaiv region is among the top 3 regions participating in the eRestoration program.

Ірина Глухова

Також Вам може сподобатись:

May 6, 2026

Mykolaiv region will not open beaches this year, - Kim

Exhibition about heroes who gave their lives for Ukraine opened in Mykolaiv

A new trolleybus route in Mykolaiv carried 15 thousand passengers

Five children hospitalized in Mykolaiv after visiting an entertainment venue

Pre-trial restraint imposed on former SBU chief in Mykolaiv region

May 5, 2026

Russian soldier to be tried for torturing civilians in Mykolaiv region

Restoration of Izmail Children's and Youth Sports School gym after drone attack estimated at 8 million

Mykolaiv plans to build 300 apartments for rental housing

May 4, 2026

Mykolaiv region's highway repair for 633 million won by contractor with fictitious works

Head of Beryslav District Council suspected of fake volunteering

Director of a company is suspected of embezzlement in water supply in Mykolaiv region

Head of Mykolaiv hospital's operating room seized with 15 thousand dollars

May 3, 2026

Wealth is growing, income is falling: declarations of Mykolaiv MPs for 2025

In Mykolaiv, the court canceled the repeated mobilization of a previously unfit

Missile strike on Mykolaiv injures people and damages houses