12 December 2024

More than 20 million offered to repair bomb shelter in Mykolaiv college

(Photo: Wikipedia)

In Mykolaiv, it is planned to repair the storage facility at a polytechnic college. The budget for the work was set at over UAH 23 million.

According to the public procurement website Prozorro, the customer was the Department of Capital Construction of the Mykolaiv Regional Military Administration, which announced the tender on December 12.

According to the tender documentation, it is a major overhaul of the civil defense facility of the Mykolaiv Polytechnic Vocational College - storage facility No. 52498, located at 11-A Nikolska Street.

Participants can submit their proposals until December 27, and on the same day the winner will be selected in an open bidding format with features that provide for shorter deadlines than before. The contractor must complete all work by the end of 2025. For this, it will receive UAH 23 million 438 thousand.

During the repair, ventilation, heating, water supply, lighting and electricity systems will be installed. A hydraulic lift for people with disabilities, emergency lighting, fire alarms, automatic fire extinguishing systems and gas alarms will be installed.

Dismantling works will include dismantling of walls, floors and doors in the basement. General construction activities will include the arrangement of evacuation and emergency exits, floor installation, facade insulation, painting of walls and ceilings, and other necessary works. The shelter is also designed to be an inclusive environment: tactile tiles, signs with information about floors and exits will be installed, and a shower and bathroom for people with disabilities will be equipped.

Meanwhile, in Mykolaiv, the reconstruction of the lyceum' s basement to shel ter the lyceum was awarded to a company that regularly receives contracts from city council offices and departments. Only one bidder attended the auction, and the contract was awarded to that company.

Андрій Колісніченко

You may also like:

July 31, 2026

How to Properly Install Mineral Wool Insulation: A Step-by-Step Guide from KRAIZEL Advertisement

In Mykolaiv, construction of an 80-million shelter has been halted at the bidding stage

Corporate Travel Kit: What an Employee Will Really Need Advertisement

Ombré on Dark Hair: How to Choose a Shade for a Natural Look Advertisement

A judge from Mykolaiv was punished in connection with a case involving the discharge of a soldier from military service

July 30, 2026

Nearly 80 million will be allocated for the repair of water mains in two villages in the Kherson region

The case of a former lawmaker from Mykolaiv accused of illegal maritime business has been referred to court

Court Removes Mykolaiv Utility Official for Leaking Procurement Data to a Business

Parents demanded a shelter for the Academy of Children's Creativity in Mykolaiv

The Mykolaiv City Council transferred a plot of land located along the highway to Odesa to the state

The case involving millions in overpayments for school equipment in Odesa has been referred to court

A session of the Mykolaiv City Council was adjourned due to a lack of quorum

A Mykolaiv businessman avoided prison for a scheme to supply parts to Russia

In Mykolaiv, lawmakers are summoning the management of Mykolaivelektrotrans over a controversial procurement

In the Mykolaiv region, the prosecutor's office obtained a court order to seize 32 hectares of pastureland from an unscrupulous tenant