Aug. 3, 2025, 2:15 p.m.

Children could not get to a shelter during an air strike in Mykolaiv

(Photo: Suspilne News)

In the Karabelny district of Mykolaiv, local residents found a locked shelter when the alarm sounded. Families with children were unable to hide.

This was reported by a local publication.

They expressed their indignation in house chats and social networks, noting that the inaccessibility of shelters endangered people's lives and health.

A company from Mykolaiv, which had been featured in journalistic investigations into overpayments, won a tender to reconstruct a building into a shelter. In total, since 2024, it has already received government contracts worth more than UAH 142 million.

During the full-scale war in the Mykolaiv region, a group of contractors was formed that local officials began to entrust with expensive construction work, primarily on shelters in schools. Some of these firms are linked to a member of the Mykolaiv Regional Council. In total, 1608 construction contracts in the north of Mykolaiv region were recorded in Prozorro in 2022-2025. The total expected cost of the works is almost UAH 1.44 billion. The full-scale war has significantly affected the distribution of contracts: ten of the 25 most expensive projects relate to the construction or renovation of school shelters.

In two settlements in Kherson Oblast, residents will be protected from shelling.

The new building is planned to be modern, energy-efficient, and fully adapted to the needs of children, taking into account barrier-free access and safety requirements. A bomb shelter has been designed in the basement, which can accommodate up to 227 people in case of an emergency. A separate warm passage to the shelter and dining room will be arranged for kindergarten children to ensure safe and comfortable movement.

Олександра Горст

Також Вам може сподобатись:

April 6, 2026

Resident of Mykolaiv region lost her home for calling to pass on information about the Armed Forces

Counterfeit euros worth half a million: currency scheme exposed in Voznesensk

Mykolaiv concealed 82 million in agricultural exports

Embezzlement in elevator procurement exposed in Mykolaiv

April 5, 2026

Action in memory of fallen soldiers held in Mykolaiv region

Language testing center opened in Mykolaiv

Transport that operated in Odesa during the blackout returned to Mykolaiv

Shelling of Kherson and Mykolaiv regions: dead, wounded, including a child

April 4, 2026

Mykolaiv region farmers get a chance for revival after Kakhovka HPP explosion

Mykolaiv received 26 new buses on credit for EUR 4.5 million

Reconstruction of boiler houses in Voznesensk was awarded to a contractor with a history of overpayments

Only Odesa City Council did not answer how much it spent on the Defense Forces

April 3, 2026

Comedian Volodymyr Komarov said goodbye in Odesa on April 1

Embezzlement at heating network repair exposed in Pivdenoukrainsk

New real estate and reduced salary: what the declaration of the mayor of Bashtanka revealed