23 December 2024

UAH 94 million to be raised for overhaul of Voznesenskyi Lyceum in Mykolaiv region

(PHOTO: Dream)

The Voznesensk Lyceum in Mykolaiv region is to be renovated and insulated. It is planned to find funding for more than 94 million hryvnias.

This was reported by the Center for Public Investigations with reference to the Dream ecosystem.

It is planned to overhaul and thermally modernize the buildings of Ascension Lyceum No. 10 at 20 Sobornosti Street.

The purpose of the reconstruction is to provide quality educational services for community children. The project was initiated by the Voznesensk City Council.

Screenshot: Dream

According to the project description, the complex of buildings, which became the property of the Voznesensk community in December 2022, needs major repairs. The roof is leaking, mold has appeared on the walls, the heating main is rotten, and the internal network and some windows are damaged. After the renovation, it will be used as a specialized lyceum with a dormitory for students from different communities.

The estimated duration of the project is 24 months. The project budget is UAH 94 million 693 thousand 922.

The project is aimed at creating comfortable and safe conditions for children to stay in the building of the educational institution, improving its technical condition and appearance. It ensures the repair and preservation of communal property, improvement of thermal comfort, and budgetary savings by reducing energy consumption.

Screenshot: Dream

The lyceum reconstruction project is currently in preparation and requires funding.

In addition, 23 million hryvnias are to be raised for the energy-efficient reconstruction of Mykolaiv Gymnasium #56. The design and estimate documentation was completed in 2017-2019 and needs to be adjusted. The goal of the project is to improve the energy efficiency and comfort of the gymnasium's premises, to provide optimal conditions for study and recreation for students and staff.

And UAH 20 million was allocated from the local budget for the insulation of the Mykolaiv kindergarten. We are planning to reconstruct the building of preschool educational institution No. 52 with thermal sanitation. The project aims to maintain optimal temperature conditions and reduce heating costs.

Анна Бальчінос

You may also like:

June 21, 2026

Following a request from the Center for Strategic Research, the Ministry of Defense is implementing changes to the funding of the national resistance

June 20, 2026

In Mykolaiv Oblast, the village head’s property was seized due to corruption involving the water supply system

A resident of the Mykolaiv region was selling "disappearances" from the "Oberig" system

In the Mykolaiv region, a soldier destroyed dozens of graves and was sent to prison

In the Kherson region, 25 people were wounded, and in the Mykolaiv region, drones damaged a gas station

June 19, 2026

In Mykolaiv, part of a rehabilitation center was leased without a bidding process

How a Gold Ring Is Made: A Look Inside a Handcrafted Workshop Advertisement

An official from the Mykolaiv region stole money and fled abroad

June 18, 2026

Mykolaiv Maternity Hospital No. 3 will receive 5.5 million

A defender from Mariupol has taken charge of a new veterans' center in the Mykolaiv region

Hospital management is being reformed in the Mykolaiv region

In the Mykolaiv region, a Ukrainian language teacher has been nominated for a Verkhovna Rada award

The Mykolaiv Maternity Hospital Will Receive Over 5 Million

June 17, 2026

The Mykolaiv Maternity Hospital Has Accumulated Millions in Debt

A support center for veterans and their families will be established in the Mykolaiv region