12 October 2024

Three million to be spent on fire safety in two Mykolaiv educational institutions

(PHOTO: Americanfiresys)

Mykolaiv plans to install fire alarms in two educational institutions. Almost three million hryvnias will be spent from the budget.

This was reported by the Center for Public Investigations with reference to the Prozorro public procurement system.

Thus, the Education Department of Mykolaiv City Council announced a tender for the current repair of the automatic fire alarm system and fire warning system of Mykolaiv Lyceum No. 28 and Mykolaiv Gymnasium No. 32.

The expected cost of repairs at Lyceum No. 28 is UAH 2,009,230.80, and at Gymnasium No. 32 - UAH 952,497.60. The minimum price reduction step is 50% of the purchase price.

The deadline for submitting bids is October 19. The auctions are scheduled to start on October 21. No security is required for the tender offer, as well as for the contract.

According to the tender documents, the winner must, among other repairs, install smoke, heat and manual fire detectors, install a monoblock of voice and light and sound warning, a loudspeaker, and set up fire extinguishing and smoke removal systems.

The repair work should be completed by December 15, 2024.

In addition, the Education Department has announced two auctions for the provision of fire safety training services for teachers. Thus, it is planned to spend UAH 227,873 from the budget for one service, and UAH 43,637 for the second.

Bidding is also scheduled to start on October 21. The services must also be provided by December 15 this year.

According to the first announcement, 332 students are to be trained, and 91 students are to be trained under the second. The services are to be provided by a training center that provides fire safety training and has the appropriate certificates and permits from the State Emergency Service of Ukraine.

The training will be provided to employees appointed to civil protection units, heads of business entities and their deputies, and officials responsible for civil protection in central and local executive authorities.

Earlier, the fire alarm and warning system at the Tiligul Agricultural Vocational College in Odesa Oblast will be repaired by the company that offered the highest price. The expected cost of the work, which the contractor was to complete by December 1, 2024, was more than UAH 6 million.

In May, Mykolaiv was looking for a contractor to be paid more than UAH 12 million to install an automatic fire alarm system in one of the city's hospitals. For this money, the contractor was supposed to overhaul the automatic fire alarm and warning system at City Hospital No. 3.

Recently, a college shelter was planned to be repaired in Mykolaiv region. Almost thirty million hryvnias will be spent from the state budget. Thus, it is planned to overhaul the radiation shel ter in the dormitory building of the Novodesskiy Vocational College. The estimated duration of the repair is seven months. The shelter, with an area of 1520 square meters, is designed for 450 people.

Анна Бальчінос

You may also like:

July 11, 2026

A trial has begun in Mykolaiv against an official accused of embezzling 1.3 million on traffic lights

In Odessa, a company implicated in an embezzlement case was awarded a 21-million contract for cogeneration

In Mykolaiv, the high school's cafeteria will be renovated for 27.5 million

In Mykolaiv Oblast, 71 families of veterans will receive housing compensation

July 10, 2026

In Kherson, a suspect accused of causing millions in losses at a school shelter was released on bail

The Chairman of the Mykolaiv Regional Council Has Taken the Helm of the Regional Branch of "Servants"

Opinions are divided in Mykolaiv over the name of the memorial

A court released a prisoner from the Mykolaiv region to fight in place of serving his prison sentence

How to Tell If a Shampoo Isn't Right for Your Hair Type Advertisement

E. coli was found in the water at a popular beach in the Mykolaiv region

A court in Mykolaiv found a mother guilty of attempting to sell her child

More than half a million metric tons of raw materials from the Mykolaiv Alumina Plant are being prepared for sale

Auditors found that the construction costs for a school shelter in the Mykolaiv region had been overstated

July 9, 2026

In Mykolaiv, there is talk of a shortage of funds for salaries in the cultural sector

The Odesa region plans to spend more than 100 million on renovating a high school building