02 November 2024

One of the favorites of state orders wins a tender in Odesa for 700 million

(Photo: Wikimapia)

The Odesa branch of the state enterprise Ukrainian Sea Ports Authority has conducted a tender to select a contractor for the overhaul of the third stage of the port's transport overpass.

The relevant information is available in the Prozorro electronic procurement system.

The tender was held on October 18 and the winner was Avtostrada Group of Companies Limited Liability Company. The competitor was Avtomagistral-Pivden LLC. Avtostrada Group of Companies LLC agreed to work for UAH 771 million 770 thousand, which is UAH 194 million 30.4 thousand less than the expected purchase price.

Earlier , analysts of the Ukrainian online analytical system YouControl calculated that.

Over the past year, Avtostrada Group LLC, which is engaged in the construction and repair of roads and infrastructure facilities, has received about UAH 12 billion in public funds. The company is part of MS Capital, the ultimate beneficiary of which is Maksym Shkil.

Avtomagistral-Pivden LLC received UAH 10.5 billion from the state. A 2021 article by Forbes Ukraine states that the company became a key contractor of the Big Construction program before the war started. The total value of the company's won tenders is about 580 billion hryvnias, and its beneficiary is Oleksandr Boyko, who is also associated with Shlyakhovik-97 LLC. This company is also an important supplier of materials and services to Avtomagistral-Pivdenna.

Open bidding with special features means that almost all terms are shorter than in open bidding under the Law on Public Procurement. That is, this procurement is much faster than open tenders.

The period for submitting proposals is seven calendar days, and the period for challenging qualifications is five calendar days.

Often, there is no auction during such tenders, so the participant has no competitors.

However, the year before last, the Cabinet of Ministers of Ukraine temporarily changed the rules of bidding for the period of martial law in Ukraine and within 90 days from the date of its termination or cancellation.

The government temporarily canceled electronic auctions. Since then, tenders announced in Prozorro can be held without an auction.

Кирило Бойко

You may also like:

June 26, 2026

Police Detain Village Council Chairman in the Odesa Region Over Land Fraud

A case has been opened in Odesa regarding the brutal treatment of TCC fighters by a dog

The Center for Policy and Reforms won a court case against a company from the Odesa region that had challenged an article

ONU Explained What Happened to the Department of Ukrainian History

Will Russia Be Able to Block the Black Sea Again?

Akzent found out what Odessa residents think about the fare increase on minibuses

Crimea Beyond Empires: A 3D Collection of Materials on the Peninsula Was Presented in Odesa

Excavations have resumed in downtown Odessa: the first discovery has already been made

A Crimean Tatar flag was unfurled in downtown Odesa

Ukrzaliznytsia has scheduled an additional train to the private beaches in the Odesa region

In the Odesa region, a man who made a false bomb threat was sentenced to prison

The Odessa City Executive Committee Allocated 294 Million for Environmental Protection

Overnight, Russian drones cut off power to part of the Odesa region

June 25, 2026

Odessa has postponed consideration of new advertising placement schemes

A contractor with a history of unfinished projects won a 114-million contract from the Port of Odesa