10 October 2024

One hundred and fifty million for heat: Mykolaiv decided to install heating stations

(PHOTO: Target Management)

The city of Mykolaiv decided to install heating stations in two high-rise buildings. It is planned to spend almost UAH 150 million on this.

This was reported by the Center for Public Investigations with reference to the Dream ecosystem.

The initiator of the projects was the regional utility company Mykolaivoblteploenergo.

Thus, according to the ecosystem, it is planned to install individual heating stations in multi-storey residential buildings in the Namiv neighborhood and in the Korabelnyi district.

An individual heating point (IHP) is an autonomous unit that integrates into the building's heating system and allows for automatic regulation of heat supply depending on the actual needs of the building.

UAH 70.9 million has been allocated for the heat point in the Namiv neighborhood and UAH 78.3 million in the Korabelny district.

Each individual heat point includes the following components:

The main goals of the project are to increase the efficiency of the heating system, reduce heat losses, optimize heat consumption, improve the comfort of residents by individually adjusting the temperature in the house, and reduce the cost of maintenance and heating bills.

According to the project descriptions, it will take 24 months to install the heating stations. The projects are currently under preparation and await funding.

Mykolaiv also planned to build a complex that will provide the city with a backup source of heat. More than eight hundred million hryvnias have been allocated for the project. Thus, it is planned to build a biomass power generating complex to provide a backup source of heat for the boiler house of the Mykolaivoblteploenergo utility company.

In addition, a boiler house reconstruction is planned in Mykolaiv. The reconstruction was initiated by the Mykolaiv City Council. Mykolaivoblteploenergo is the project executor. The project cost is UAH 176 million. The project aims to improve energy efficiency, reliability and safety of heat supply, as well as reduce the environmental impact of the boiler house.

Recently, the city received 6 modular boiler houses from the Government of the Kingdom of Denmark. The assistance was provided to ensure that the upcoming heating season will be held in the context of a full-scale war without risks for the townspeople.

Анна Бальчінос

You may also like:

Aug. 5, 2026

The commander of the TrO brigade described for the first time how the NRK was landed on the shore of the Kinburn Spit

A Million in Cash and a Mitsubishi: Director of a Children's Hospital in Mykolaiv Reveals Her Assets

Aug. 4, 2026

The structure of municipal hospitals in Mykolaiv has been changed

A Vinnytsia-based company has won a 450-million tender to repair the highway to Mykolaiv

In Mykolaiv, schoolchildren have been moved to shelters for classes

In Podilsk, a contractor was selected without a competitive bidding process to repair the roof damaged by a hurricane

Suicide bombers struck Mykolaiv; one person was killed, and children are among the wounded

Romania has begun purchasing electricity from Ukraine via Moldova

Aug. 3, 2026

Complaints about illegally dumped trash topped the list of complaints in the Odesa and Mykolaiv regions

How to Choose a Car Rental Service: 6 Criteria to Consider Advertisement

In Mykolaiv, authorities have succeeded in opening a case regarding a scheme to provide shelter for schoolchildren

A network of shell companies used for money laundering was uncovered in Mykolaiv

A poultry farm in the Mykolaiv region has been put up for sale for $3.5 million

Effective Protection of the Respiratory Tract and Situations Where Lisobakt Rino Spray Is Recommended Advertisement

Mykolaiv Oblast ranks among the top three regions in terms of utility bill debt