10 October 2024

One hundred and fifty million for heat: Mykolaiv decided to install heating stations

(PHOTO: Target Management)

The city of Mykolaiv decided to install heating stations in two high-rise buildings. It is planned to spend almost UAH 150 million on this.

This was reported by the Center for Public Investigations with reference to the Dream ecosystem.

The initiator of the projects was the regional utility company Mykolaivoblteploenergo.

Thus, according to the ecosystem, it is planned to install individual heating stations in multi-storey residential buildings in the Namiv neighborhood and in the Korabelnyi district.

An individual heating point (IHP) is an autonomous unit that integrates into the building's heating system and allows for automatic regulation of heat supply depending on the actual needs of the building.

UAH 70.9 million has been allocated for the heat point in the Namiv neighborhood and UAH 78.3 million in the Korabelny district.

Each individual heat point includes the following components:

The main goals of the project are to increase the efficiency of the heating system, reduce heat losses, optimize heat consumption, improve the comfort of residents by individually adjusting the temperature in the house, and reduce the cost of maintenance and heating bills.

According to the project descriptions, it will take 24 months to install the heating stations. The projects are currently under preparation and await funding.

Mykolaiv also planned to build a complex that will provide the city with a backup source of heat. More than eight hundred million hryvnias have been allocated for the project. Thus, it is planned to build a biomass power generating complex to provide a backup source of heat for the boiler house of the Mykolaivoblteploenergo utility company.

In addition, a boiler house reconstruction is planned in Mykolaiv. The reconstruction was initiated by the Mykolaiv City Council. Mykolaivoblteploenergo is the project executor. The project cost is UAH 176 million. The project aims to improve energy efficiency, reliability and safety of heat supply, as well as reduce the environmental impact of the boiler house.

Recently, the city received 6 modular boiler houses from the Government of the Kingdom of Denmark. The assistance was provided to ensure that the upcoming heating season will be held in the context of a full-scale war without risks for the townspeople.

Анна Бальчінос

You may also like:

June 26, 2026

In Mykolaiv Oblast, a chief physician is suspected of embezzlement in connection with the renovation of a medical facility

In Mykolaiv, a court dismissed activists' complaint alleging corruption in connection with a cover-up

A sailor from the Mykolaiv region passed information about his unit's commanders to enemy intelligence

June 25, 2026

Tuition fees at art schools in Mykolaiv will increase starting September 1

Mykolaiv Will Spend 1.3 Million on Insurance for the Supervisory Board

June 24, 2026

In Mykolaiv Oblast, the leadership of the Regional Center for Social Services will stand trial for torturing a father of many children

In the Mykolaiv region, over one million hryvnias were lost due to a real estate deal

A Rivne-based contractor with a criminal record won a 38-million contract for a school shelter in Artsyz

Garbage collection costs are rising in Mykolaiv: new rates have been approved

The art of shoemaking, which refuses to give in to mass production Advertisement

Illegal detention and broken ribs: what was discovered at the Mykolaiv TCC

A large-scale removal of small architectural forms is planned in Mykolaiv

June 23, 2026

In the Mykolaiv region, fines for overloaded trucks have quadrupled

The Mykolaiv Traffic Police Department commented on a traffic accident involving an employee

Arsonists who set fire to military personnel's vehicles were detained in Mykolaiv