02 December 2024

Mykolaiv allocated 6 million for import of bulky waste

(PHOTO: Glamglow)

More than six million hryvnias have been allocated from the budget for garbage collection in one of Mykolaiv's districts. It is planned to install 11 containers and take the collected waste to the city landfill.

This is evidenced by data from the electronic public procurement system Prozorro.

The administration of the Zavodsky district of Mykolaiv City Council has announced a tender for the removal of bulky waste by special equipment.

Bids can be submitted until December 7, and the auction is scheduled to start on December 9.

UAH 6 million 499 thousand 860 was allocated for these services. The minimum price reduction step is 1% of the amount, i.e. 64 thousand 998 hryvnias.

Screenshot: Prozorro

According to the tender documentation, the selected contractor will have to remove 25,590 m3 of bulky waste.

Payments will be made by transferring funds to the contractor's bank account based on the certificate of services rendered.

For the quality and timely provision of services, the contractor must have a sufficient number of special equipment, namely: at least 3 bunker trucks and 11 open-type containers for collecting bulky waste with a volume of 10 m3.

The contractor shall also:

Services must be provided from January 1 to December 31, 2025.

A similar tender was also announced by the Mykolaiv Housing and Maintenance Department. They are looking for a contractor to handle waste disposal. Five million hryvnias were allocated from the budget for this purpose. In total, 20 thousand cubic meters of garbage will need to be disposed of. The contractor will have to take waste from Mykolaivska PSC's facilities to the municipal landfill or other authorized landfills.

The administration of Zavodskiy district has allocated more than four million hryvnias from the city budget to eliminate unauthorized dumpsites. The selected contractor will also have to provide services through the next year, 2025, and clean up 33,930 m3 of landfill areas.

Анна Бальчінос

You may also like:

July 11, 2026

A trial has begun in Mykolaiv against an official accused of embezzling 1.3 million on traffic lights

In Odessa, a company implicated in an embezzlement case was awarded a 21-million contract for cogeneration

In Mykolaiv, the high school's cafeteria will be renovated for 27.5 million

In Mykolaiv Oblast, 71 families of veterans will receive housing compensation

July 10, 2026

In Kherson, a suspect accused of causing millions in losses at a school shelter was released on bail

The Chairman of the Mykolaiv Regional Council Has Taken the Helm of the Regional Branch of "Servants"

Opinions are divided in Mykolaiv over the name of the memorial

A court released a prisoner from the Mykolaiv region to fight in place of serving his prison sentence

How to Tell If a Shampoo Isn't Right for Your Hair Type Advertisement

E. coli was found in the water at a popular beach in the Mykolaiv region

A court in Mykolaiv found a mother guilty of attempting to sell her child

More than half a million metric tons of raw materials from the Mykolaiv Alumina Plant are being prepared for sale

Auditors found that the construction costs for a school shelter in the Mykolaiv region had been overstated

July 9, 2026

In Mykolaiv, there is talk of a shortage of funds for salaries in the cultural sector

The Odesa region plans to spend more than 100 million on renovating a high school building