29 November 2024

Mykolaiv announces bidding for waste disposal for 5 million

(PHOTO: Infogram)

Mykolaiv is looking for a contractor to handle waste disposal. Five million hryvnias have been allocated from the budget for this purpose.

This is according to the Prozorro electronic public procurement system.

The Mykolaiv Housing and Maintenance Department has announced a tender for the purchase of waste management services. The expected value of the procurement is UAH 5 million.

The auction is scheduled for December 4, 2024. The minimum price reduction step is 50 thousand hryvnias.

Screenshot: Prozorro

The tender offer must be accompanied by a security in the form of an electronic bank guarantee in the amount of UAH 150 thousand.

The work must be carried out within a year, from January 1 to December 31, 2025, inclusive. Payment will be made after the works are completed within 15 days.

A total of 20 thousand cubic meters of waste will need to be disposed of. The contractor will have to take waste from Mykolaivska PES facilities to the municipal landfill or other authorized landfills. Separate waste collection shall be carried out in containerized containers.

The Contractor shall carry out:

According to the documentation, if only one offer is submitted, the electronic procurement system will not evaluate such a tender offer and will determine it as the most cost-effective. The selected contractor must provide documents confirming its compliance with the qualification requirements.

In October, the Department of Housing and Communal Services announced a tender to find a waste sorting contractor. According to the terms, the waste sorting entity has to transfer funds to the bank account of Mykolaivkomuntrans for the maintenance of the city's solid waste landfill on a monthly basis.

At the end of September, the deputies voted to approve the tender procedure for the construction of a waste sorting station. It is planned that after the tender, the winner will be engaged in the construction of the sorting line and its further operation. Also in early October, Mykolaiv received technical assistance for municipal utilities that will be used for a construction waste storage site.

Анна Бальчінос

You may also like:

June 10, 2026

Temporary power outages in Mykolaiv and the region: where scheduled works will be carried out

Mykolaiv Executive Committee to Consider Redistribution of Funds for Schools, Kindergartens and Beneficiaries

June 9, 2026

Intelligent fittings: wearable sensors and integration with future automation Advertisement

Mykolaiv region: lawyer detained for selling fictitious disability

In Mykolaiv, the head of a vocational school is suspected of a scheme with "dead souls"

June 8, 2026

MP's Izmail company wins right to repair Odesa streets without auction

From diesel to chainsaws: what Kherson parks spent money on

Former Chief Justice of the Supreme Court sentenced to 5 years and confiscated real estate in Mykolaiv

From Otto to Zalando: the best German stores with delivery to Ukraine Advertisement

Kherson allocated 119 million for landscaping, lighting and landfill

Prosecutor's Office opens proceedings over overpayment for school equipment in Odesa

A company with a history of embezzlement received half a billion to protect the energy sector in Mykolaiv region

Elite SUVs and family car fleets: what cars do the directors of Mykolaiv medical institutions own?

Kherson soldier accused of passing data to FSB on deployment of Ukrainian Armed Forces in Odesa

He replaced his prison robe with Russian camouflage: a traitor was sentenced in Mykolaiv