24 April 2025

Kherson School Reconstruction Starts: ₴214M Project to Upgrade Facilities

(Illustration: DREAM)

In the Kherson region, a school that was damaged by shelling is to be reconstructed: a kindergarten, a shelter, a stadium, and all communications will be completed. The total cost of the project exceeds 214 million hryvnias, of which only 17% has been funded so far.

This was reported by the Center for Public Investigations with reference to the DREAM ecosystem.

Due to enemy shelling, the building of the Arkhangelsk hub general secondary education institution in Kherson region was severely damaged: shell fragments damaged windows, doors, facade, and roof. The walls and ceilings are collapsing due to leaks, which poses a threat to students and staff. In this regard, the community decided to reconstruct the school.

Screenshot: DREAM

According to the description, the project involves the complete renovation of the school building, the completion of premises for the kindergarten, and the arrangement of a full-fledged shelter on the school grounds. The design and estimate documentation has already been approved.

The reconstruction includes facade insulation, replacement of all communications, a new roof, and modernization of heating, water supply, and electrical systems. It is also planned to create a resource room, a media library, an assembly hall, sports grounds and a dining room with new equipment. Particular attention will be paid to inclusion - the project takes into account the needs of children with disabilities.

Part of the funds - UAH 35 million - were allocated from the state fund for the elimination of the consequences of armed aggression. The total cost of the project is over UAH 214 million.

Screenshot: DREAM

In addition, a stadium and a training ground for basic military training will be built near the school, as well as playgrounds for different age groups, bicycle parking, and a modern medical office.

The Kherson lyceum also plans to upgrade its canteen with a modernBasicKitchen model to provide meals for 340 students. Almost UAH 200,000 of the 10 million has already been allocated for the project. And in the basement of Kherson Gymnasium No. 1, they plan to build an autonomous bomb shelter. Last year, 200 thousand hryvnias were allocated from the city budget for design and expertise, but more than 17 million more are needed to complete the work.

Анна Бальчінос

You may also like:

May 31, 2026

Fuel has disappeared in the occupied Kherson region, buses no longer run

Kherson and 36 settlements of the region attacked by occupants: one wounded

May 30, 2026

Angelina Jolie came to Kherson on the advice of a British photographer

Handing out rubles and calling to the "Russian world": court sentences former Kherson deputy

Broken contract with the Ministry of Defense and new contracts: who was entrusted with the critical infrastructure of Kherson region

Ex-minister of Kherson region occupants abducted Ukrainian children

May 29, 2026

Kherson region: SBU exposes Themis servant from occupation court

Kherson budget for healthcare, transportation and emergency response was cut

Oleshky residents break through the blockade through mined roads

Ukrainian intelligence defeats Russian logistics in Kherson region

A videographer of the occupation television was exposed in Kherson

New testimony in the case of high treason against Kherson deputy heard in court

Ex-officer of Kherson SIZO sentenced in Odesa

May 28, 2026

In Kherson region, occupants intensify assaults near Antonivsky bridges

Kherson museum opens exhibition in Kyiv after being robbed by occupants