Jan. 14, 2026, 1:05 p.m.

Kherson hospital plans to renovate basement for UAH 271 million

(Karabeleş Hospital. PHOTO: MOST)

Two basement reconstructions were planned for the Kherson City Hospital named after Karabelesh.

In 2025, the renovation projects were published on the DREAM platform. The first project worth 165.2 million hryvnias will be implemented in the basement of Polyclinic #2; this shelter will also serve visitors to the children's polyclinic. The second shelter will appear in a five-story hospital building, and its reconstruction will cost almost 106 million. The work is expected to be completed within 8-10 months, which will help protect patients and staff at the multidisciplinary facility, which has unique surgical departments for the city and region.

Karabelets Hospital is a multidisciplinary institution that provides primary and secondary medical care to residents of Kherson and the region. The hospital has 12 departments, including unique centers for vascular surgery, proctology and otolaryngology. Given that two departments of the institution serve the needs of the entire region, the safety of staff and patients is a priority. That is why the projects for the construction of new shelters have received support at the state level: the work will be financed by a subvention from the state budget.

In particular, the construction of a shelter in a kindergarten was initiated in the Kherson region. The project was estimated at over UAH 135 million.

A project to reconstruct the basement of Zelenivskyi nursery school No. 47 to equip a modern shelter has been launched in the Kherson region. The total area of the renovated space will be almost 894 square meters, which will allow for the simultaneous accommodation of 216 children and educators.

The project envisages a dual use of the premises: in peacetime it will serve as a safe educational space and in emergency situations as a shelter for the village residents. It will be equipped with a barrier-free environment accessible to people with limited mobility, modern engineering equipment, furniture and necessary equipment.

Катерина Глушко

Також Вам може сподобатись:

April 14, 2026

Head of the occupation administration of Kalanchak in Kherson region was served with a notice of suspicion

Russia continues to attack hospitals in Kherson

April 13, 2026

Fictitious certificates and 5 million in his pocket: in Kherson, the contractor's duties were extended

Founder of a charitable foundation is suspected of financing the Russian army in Kherson region

Easter bread from occupied Oleshky became a symbol of survival

Former member of Kherson executive committee sentenced to 10 years in prison

April 12, 2026

Amazing South: natural treasure of Kherson region

Kherson court upholds fine imposed on 19-year-old by TCC

Kherson resident, who was taken away with a bag on his head, returned from captivity

Transport in Kherson operates on a reduced schedule

The enemy attacked more than 40 settlements in Kherson region: there are dead and wounded, including a child

April 11, 2026

Aggressor's troops shelled a bus station and nine houses in Kherson region

A scheme with medical certificates to evade mobilization surfaces in Mykolaiv

April 10, 2026

A fake governor and a battalion of traitors: 12 residents of Odesa, Kherson and Crimea are on trial

Oleshky turned into a ghost: military showed footage of destroyed town