14 January 2026

Kherson hospital plans to renovate basement for UAH 271 million

(Karabeleş Hospital. PHOTO: MOST)

Two basement reconstructions were planned for the Kherson City Hospital named after Karabelesh.

In 2025, the renovation projects were published on the DREAM platform. The first project worth 165.2 million hryvnias will be implemented in the basement of Polyclinic #2; this shelter will also serve visitors to the children's polyclinic. The second shelter will appear in a five-story hospital building, and its reconstruction will cost almost 106 million. The work is expected to be completed within 8-10 months, which will help protect patients and staff at the multidisciplinary facility, which has unique surgical departments for the city and region.

Karabelets Hospital is a multidisciplinary institution that provides primary and secondary medical care to residents of Kherson and the region. The hospital has 12 departments, including unique centers for vascular surgery, proctology and otolaryngology. Given that two departments of the institution serve the needs of the entire region, the safety of staff and patients is a priority. That is why the projects for the construction of new shelters have received support at the state level: the work will be financed by a subvention from the state budget.

In particular, the construction of a shelter in a kindergarten was initiated in the Kherson region. The project was estimated at over UAH 135 million.

A project to reconstruct the basement of Zelenivskyi nursery school No. 47 to equip a modern shelter has been launched in the Kherson region. The total area of the renovated space will be almost 894 square meters, which will allow for the simultaneous accommodation of 216 children and educators.

The project envisages a dual use of the premises: in peacetime it will serve as a safe educational space and in emergency situations as a shelter for the village residents. It will be equipped with a barrier-free environment accessible to people with limited mobility, modern engineering equipment, furniture and necessary equipment.

Катерина Глушко

You may also like:

July 10, 2026

The deputy head of the occupation administration in Nova Kakhovka was sentenced in absentia to eight years in prison

A district court judge in the Kherson region was forced to resign

An attack by the occupying forces in the Kherson region claimed three lives and left 34 people wounded

July 9, 2026

"A university is more than just four walls": the story of the relocated Kharkiv State University, which persevered

A former ATB security guard from Kakhovka was sentenced for treason

A judge from Kherson won her case against the Qualification Commission in the Supreme Court

How the War Changed Men's Approach to Job Hunting in 2026 Advertisement

The enemy attacked the Kherson region with drones and artillery; there are fatalities and 19 wounded

July 8, 2026

The Regional State Administration will spend more than 7 billion on roads and bridges in the Kherson region

The High Council of Justice Will Not Dismiss a Judge from the Kherson Region

The Ombudsman has launched an investigation into the circumstances surrounding the mobilization of a high school principal from the Kherson region

A resident of the Kherson region will stand trial for providing material support to the Russian army

A traffic police inspector from Kherson was sentenced to 15 years in prison for working for Russia

The number of building permits in Mykolaiv rose by 60%

One person was killed and six were injured in Kherson when a Russian drone struck a minibus