14 January 2026

Kherson hospital plans to renovate basement for UAH 271 million

(Karabeleş Hospital. PHOTO: MOST)

Two basement reconstructions were planned for the Kherson City Hospital named after Karabelesh.

In 2025, the renovation projects were published on the DREAM platform. The first project worth 165.2 million hryvnias will be implemented in the basement of Polyclinic #2; this shelter will also serve visitors to the children's polyclinic. The second shelter will appear in a five-story hospital building, and its reconstruction will cost almost 106 million. The work is expected to be completed within 8-10 months, which will help protect patients and staff at the multidisciplinary facility, which has unique surgical departments for the city and region.

Karabelets Hospital is a multidisciplinary institution that provides primary and secondary medical care to residents of Kherson and the region. The hospital has 12 departments, including unique centers for vascular surgery, proctology and otolaryngology. Given that two departments of the institution serve the needs of the entire region, the safety of staff and patients is a priority. That is why the projects for the construction of new shelters have received support at the state level: the work will be financed by a subvention from the state budget.

In particular, the construction of a shelter in a kindergarten was initiated in the Kherson region. The project was estimated at over UAH 135 million.

A project to reconstruct the basement of Zelenivskyi nursery school No. 47 to equip a modern shelter has been launched in the Kherson region. The total area of the renovated space will be almost 894 square meters, which will allow for the simultaneous accommodation of 216 children and educators.

The project envisages a dual use of the premises: in peacetime it will serve as a safe educational space and in emergency situations as a shelter for the village residents. It will be equipped with a barrier-free environment accessible to people with limited mobility, modern engineering equipment, furniture and necessary equipment.

Катерина Глушко

You may also like:

Aug. 23, 2026

Trains between Kherson and Mykolaiv have been canceled: passengers are advised to travel by car

Eleven people have been wounded in the Kherson region as a result of Russian aggression

Aug. 22, 2026

The Ministry of Foreign Affairs responded to Russia's attack on the Kherson Art Museum

Aug. 21, 2026

The enemy dropped KABs on a dormitory at Kherson University

Aug. 20, 2026

A documentary about a female volunteer who was abducted by the occupiers was screened in Kherson

An official at the Kherson Regional Energy Administration has been suspended from duty for accepting kickbacks on military contracts

Aug. 19, 2026

The restoration service was unable to provide a cost estimate for the restoration of the Varvarivsky Bridge

A Russian soldier was taken into custody for attacking a house in Kherson

A propaganda story cost a forester from the Kherson region 15 years in prison

Ukraine carried out a prisoner exchange; defenders from the Kherson region have returned home

In the Kherson region, a contractor and an engineer are on trial for fraud related to the repair of damaged buildings

In Kherson, Russians struck a minibus carrying passengers; there are casualties and injuries

The enemy struck an industrial facility in the Mykolaiv region with an X-22 missile

Aug. 18, 2026

A resident of the Kherson region fought against the Ukrainian Armed Forces as a member of "Storm-Z" and will stand trial

Madyar announced new European UAVs for the Kherson sector