14 June 2025

44 million allocated for construction of shelter in Oleksandrivka lyceum in Mykolaiv region

(PHOTOS: Oleksandrivka lyceum named after TG Shevchenko)

<span><span><span><span><span><span>A lyceum in Mykolaiv region decided to build a radiation shelter. More than 44 million hryvnias were allocated from the city budget for this purpose. </span></span></span></span></span></span>

<span><span><span><span><span><span>This is evidenced by the data of the </span></span></span></span></span></span><span><span><span><span><span><span><span><span>Prozorroprocurement</span></span></span></span></span></span></span></span><span><span><span><span><span><span>system </span></span></span></span></span></span><span><span><span><span><span><span>.</span></span></span></span></span></span>

<span><span><span><span><span><span>The Department of Education, Culture, Youth and Sports of the Oleksandrivka Village Council has announced an open tender for the construction of a new radiation protection shelter at the Oleksandrivka Taras Shevchenko Lyceum, located in the village of Oleksandrivka, Voznesensk district, Mykolaiv region.</span></span></span></span></span></span>

<span><span><span><span><span><span>The expected cost of the works is UAH 44.6 million including VAT. The winning contractor must complete the construction of the shelter by December 25, 2025. The works will be financed from the local budget.</span></span></span></span></span></span>

<span><span><span><span><span><span>As stated in the tender documentation, the radiation shelter is designed to improve the safety of students and staff of the lyceum in emergency situations related to radiation threats. This construction is part of measures to modernize educational institutions in the region aimed at protecting the public.</span></span></span></span></span></span>

<span><span><span><span><span><span></span></span></span></span></span></span><span><span><span><span><span><span>Screenshot: Prozorro</span></span></span></span></span></span>

<span><span><span><span><span><span>Bids will be accepted until June 28, 2025, and the auction will take place on June 30. Bids must be submitted in Ukrainian, and the minimum price reduction step is UAH 223,146, i.e. 0.5% of the expected purchase amount.</span></span></span></span></span></span>

<span><span><span><span><span><span>All works must be performed in accordance with state construction standards. Payment for the work performed will be made after acceptance by the customer, within 10 calendar days.</span></span></span></span></span></span>

Mykolaiv also announced a tender for the overhaul of two gyms on the ground floor of the Zorya sports complex. The project involves a full range of works: dismantling, construction and finishing works, upgrading water supply, sewerage, ventilation, heating and electric lighting systems, as well as gym equipment. The expected cost of the works is over UAH 16.5 million.

Анна Бальчінос

You may also like:

July 17, 2026

Dealers from Kherson and the Mykolaiv region were caught selling weapons from the front lines

A shelter for a kindergarten in Mykolaiv worth up to 100 million hryvnias: a regular contractor won the bid

July 16, 2026

A Kyiv-based company owned by a native of Odessa won a 4-billion road construction contract in the Mykolaiv region

A group of lawmakers from Odesa won a 2-billion tender for a road in the Mykolaiv region

July 15, 2026

In Pivdennoukrainsk, lawmakers blocked the closure of a municipal enterprise due to the risk of losing 15 million

The Port of Izmail is seeking a contractor to repair a gantry crane damaged by shelling

Nine people were injured after a Tornado-S strike on Ochakiv

July 14, 2026

A case involving the renovation of a building on Viiskovyi Uzviz in Odesa has been filed in court

The Odesa Regional State Administration has distributed 26 school buses purchased at a single-bidder auction

In Mykolaiv, half a million has been allocated for repairs to the facade of the local history museum

In the Mykolaiv region, legal proceedings are underway to terminate a 47-million contract

July 13, 2026

A new director has been appointed to head the Drug Enforcement Administration in the Mykolaiv region

The person in charge of the protective structures in Odesa was fired after one week on the job

July 12, 2026

Construction giant wins a 126-million contract for a project near the Dniester River

July 11, 2026

In Odessa, a company implicated in an embezzlement case was awarded a 21-million contract for cogeneration