Dec. 23, 2024, 2:28 p.m.
UAH 94 million to be raised for overhaul of Voznesenskyi Lyceum in Mykolaiv region
Цей матеріал також доступний українською44
PHOTO: Dream
The Voznesensk Lyceum in Mykolaiv region is to be renovated and insulated. It is planned to find funding for more than 94 million hryvnias.
This was reported by the Center for Public Investigations with reference to the Dream ecosystem.
It is planned to overhaul and thermally modernize the buildings of Ascension Lyceum No. 10 at 20 Sobornosti Street.
The purpose of the reconstruction is to provide quality educational services for community children. The project was initiated by the Voznesensk City Council.
Screenshot: Dream
According to the project description, the complex of buildings, which became the property of the Voznesensk community in December 2022, needs major repairs. The roof is leaking, mold has appeared on the walls, the heating main is rotten, and the internal network and some windows are damaged. After the renovation, it will be used as a specialized lyceum with a dormitory for students from different communities.
The estimated duration of the project is 24 months. The project budget is UAH 94 million 693 thousand 922.
The project is aimed at creating comfortable and safe conditions for children to stay in the building of the educational institution, improving its technical condition and appearance. It ensures the repair and preservation of communal property, improvement of thermal comfort, and budgetary savings by reducing energy consumption.
Screenshot: Dream
The lyceum reconstruction project is currently in preparation and requires funding.
In addition, 23 million hryvnias are to be raised for the energy-efficient reconstruction of Mykolaiv Gymnasium #56. The design and estimate documentation was completed in 2017-2019 and needs to be adjusted. The goal of the project is to improve the energy efficiency and comfort of the gymnasium's premises, to provide optimal conditions for study and recreation for students and staff.
And UAH 20 million was allocated from the local budget for the insulation of the Mykolaiv kindergarten. We are planning to reconstruct the building of preschool educational institution No. 52 with thermal sanitation. The project aims to maintain optimal temperature conditions and reduce heating costs.
14 квітня 2025 р. 17:06
Mykolaiv Plans ₴16.8M Apartment Building Restoration After Russian Shelling09 квітня 2025 р. 18:42
Mykolaiv City Council Plans Radiation Shelter for Kindergarten by 202610 квітня 2025 р. 17:06
Mykolaiv Hospital Plans ₴30M Modern Shelter for Patient Safety and Education03 квітня 2025 р. 18:42
Mykolaiv Allocates ₴4M for 15-Story Building Repair Tender by April 1513 квітня 2025 р. 15:43
Mykolaiv Awards ₴600M Children's Hospital Reconstruction to Antares-BUD Amid Criminal Proceedings14 квітня 2025 р. 10:12
Kherson Hospital Plans ₴38.3M Basement Renovation for Safe Shelter12 квітня 2025 р. 13:01
Kyselivka Gymnasium Reconstruction Announced with ₴100M Budget13 квітня 2025 р. 19:43
Kherson Region's Restoration: ₴5.2B for Housing, Roads, and Clinics13 квітня 2025 р. 11:22
Germany Funds Reconstruction of Water Supply for 1,840 Residents in Kherson Region12 квітня 2025 р. 14:31
Mykolaivska CHPP Announces ₴4.7M Tender for Urban Landscaping Restoration11 квітня 2025 р. 12:02
Kherson Oncology Center to Raise ₴45.5M for MRI Installation Project13 квітня 2025 р. 12:43
Mykolaiv Allocates ₴26.1M for Ingul Bridge Repairs by 202502 квітня 2025 р. 21:22
Major Repairs Start on Kherson Secondary School Shelter with ₴17.4M Budget14 квітня 2025 р. 15:26
New ₴21.9M Outpatient Clinic to Break Ground in Kherson's Posad Pokrovske