19 May 2026

Soil subsidence noticed on Blazhka descent

(PHOTO: Screenshot from the video)

Odesa residents noticed soil sinkholes on Blazhka Descent, which reopened traffic in July 2025, and before that, they saved the descent from sliding due to a landslide.

According to the authors of the Zootop YouTube channel, the dips under the freshly laid tiles are currently found on the territory of the newly built residential complex, while the areas repaired at the expense of the city have not been affected.

"It's on the territory of the residential complex, not the city, and in principle, the road was not affected. There is a large collector under the entire descent, and not just one. It dates back to the century before last," the author of the video noted.

Experts also do not rule out the possibility that the tiles sagged due to water washing sand out from under them, but the channel's authors believe that this problem will recur.

After the landslide that occurred in early 2024, in October of that year, the Capital Construction Department of the Odesa City Council held a tender for the construction of a new drainage system for the descent. The only bidder was Rostdorstroy LLC. The final beneficiaries of Rostdorstroy LLC are currently Yuriy Shumacher, a deputy of the Odesa City Council and a representative of Hennadiy Trukhanov's Trust the Deeds party, and businessman Yevhen Konovalov. The amount of money involved was UAH 37 million 834.2 thousand.

Prior to that, in 2019, the Road Department of the Odesa City Council entered into an agreement with Rostdorstroy Limited Liability Company. The company won the tender in a fierce competition with Mykolaivbudtsentr LLC, Onur Construction International LLC, and its subsidiary Lider.

Rostdorstroy LLC won the tender, offering to carry out repairs for UAH 69 million 264 thousand 827. From September 17, 2019, to December 31, 2020, the company completed the repairs and received UAH 68 million 698 thousand 139 for them. However, in December 2020, the company was allocated another UAH 3 million 512 thousand 356 for additional work under the negotiation procedure, i.e. without an auction.

Кирило Бойко

You may also like:

July 8, 2026

In Odesa, the case of a lawyer who tried to profit from both the government and his client has been referred to court

The Anti-Corruption Court has resumed proceedings in the case of a judge from Odesa

Izmail has joined the declaration on cooperation among communities in southern Odesa Oblast

An MP from Odesa ranked second in terms of income within his faction

Izmail has transferred Ukrzaliznytsia's water supply networks to municipal ownership

Mykolaivvodokanal and the Port of "Pivdennyi" Have Been Designated as Monopolies

In the Odesa region, 10 men were caught trying to smuggle 10 men out of the country disguised as furniture

A girl who was swept out to sea in June was found dead

The TOP 20 Effect: How a Single Honest Review Can Change the Fate of a Local Business Advertisement

The number of building permits in Mykolaiv rose by 60%

The director of the Odessa Museum of History and Local Lore has died

The Odessa City Council session was adjourned before it even began

The Time-Squeeze Trap: Why We Overpay Because of Haste, Not Because of Price Tags Advertisement

In Odessa, a man took people hostage at a hair salon

The number of people injured in the rocket attack in Odesa has reached ten