21 August 2025

Odesa Port Overpaid Millions for Insulation of Motor Depot

(Odesa Commercial Sea Port. PHOTO: omtp.com.ua)

The Odesa port ordered thermal modernization of the motor depot for more than 22 million, although some materials cost half the price on the market. The cheaper competitor was rejected due to formal errors in the documentation, and the possible overpayment may exceed one and a half million hryvnias.

This was reported by Nashi Hroshi with reference to the Prozorro procurement system.

On August 11, the Odesa Commercial Sea Port SE signed a contract with Interior Group LLC for the thermal modernization of the motor depot for UAH 22.61 million. The works are to be completed in five months after a 40% advance payment (UAH 9.04 million). The project involves replacing windows and doors, reinforcing and insulating walls, repairing the roof, water supply and sewerage, and installing a solar system.

According to the tender documents, the contract price is fixed, without indexation for inflation. The project was developed by Lev Hembarsky, a private entrepreneur, and the expert opinion, including the cost estimate, was provided by First Construction Expertise.

SCREENSHOT: Prozorro

An analysis of the estimate showed that some materials were purchased at much higher prices than market prices. For example, Ceresit CN 178 mix was ordered at 33 UAH/kg, although it can be bought at 24-25 UAH/kg; Izovat 145 basalt slabs 50 mm thick were priced at 10,436 UAH/cubic meter, while in stores the prices are 4-5 thousand UAH; Baumit MVR UNI plaster was taken at 22 UAH/kg, while the market price is 13-16 UAH/kg. The possible overpayment on these items exceeds UAH 1.5 million.

The cheaper competitor, Berg Group from Kherson, was rejected due to errors in the tender documentation: there were no certificates of equipment, documents on employees and other confirmations.

To participate in the tender, it was required to have experience in major repairs or thermal modernization with CC2 class facilities, as well as relevant certificates.

SCREEN SHOT: Our Money

The port director is Oleksii Myaskovskyi, and the authorized person for procurement is Andrii Poroshenko. "Interior Group was founded in 2022 by Yevgeny Chelak from Bolgrad, who also owns Stroytekhproekt-11. Since April, Interior Group has received state orders worth UAH 39.68 million, all from the port of Odesa.

Meanwhile, the Odesa branch of the Ukrainian Sea Ports Authority announced an open tender for the reconstruction of berth 7 of the Odesa port with a budget of UAH 540 million. The winner of the multimillion-dollar contract will be announced in late August.

Анна Бальчінос

You may also like:

July 21, 2026

A multimillion-dollar tender for a veterans' hospital has been announced in Mykolaiv

The number of casualties has risen following the attack on downtown Odesa

In Odessa, the company was awarded a contract for the second time in a row to renovate a 16-story building without any competition

The rarest names for children in southern Ukraine: Min' Vu, Princess, and Zeineb

Pensions in the Odesa region fell short of the national average

In the Odessa region, a boarding school employee was accused of embezzling 350,000 from her deceased students

The enemy struck the center of Odesa; there are casualties

A city hall official was arrested in Odesa for accepting a bribe in exchange for granting immunity to a small retail kiosk

Odesa Oblast Will Receive the Largest Amount of Funding in the South for Free School Meals

A pipe-smoking championship was held in Odessa in memory of actor Komarov

July 20, 2026

A security platoon commander from the Odesa region was arrested for accepting a bribe

The former head of the election commission in Rozdilna was found guilty but not punished

How to Choose a T-Shirt That Works in Your Wardrobe Advertisement

Half a Billion Down the Drain: Who Paid for the Water Main for Odessa's High-Rises?

A Day of Mourning was declared in Odesa for the second time this week