14 November 2024

Mykolaiv Olympic Sports School is to be renovated at a cost of 115 million

(PHOTO: Dream)

Mykolaiv has decided to renovate its Olympic sports school. It is planned to spend 115 million hryvnias for this purpose.

This was reported by the Center for Public Investigations with reference to the Dream ecosystem.

The project was initiated by the Mykolaiv City Council, with the Construction Department as the executor and administrator of the funds.

It is planned to overhaul the building of the Nadiia Sports Complex (Sports School No. 4). The aim of the project is to overhaul the sports school building, including repair of the heating system and thermal sanitation. It also includes landscaping.


Screenshot: Dream

According to the project description, the specialized children's and youth sports school of the Olympic reserve is a Ukrainian type of sports school that provides training exclusively in Olympic sports. The main goal is to train young athletes to participate in high-level competitions, including the Olympics.

The project budget is UAH 115 million. Of this amount, UAH 109 million 700 thousand will be spent on capital expenditures and UAH 5 million 300 thousand on operating expenses.

To date, 26.8% of the required project amount has been funded, which is UAH 30 million from the local budget of Mykolaiv.


Screenshot: Dream

The duration of the project is 6 months.

The designer is Ihor Liubenko, who will also perform field supervision. UAH 117,342 is planned for design, and UAH 349,366 for author's supervision.

According to the YouControl online analytical system, Ihor Liubenko was registered as a sole proprietor in 2015. He earned 25 million 608 thousand 110 hryvnias from public tenders. He earned the most from public procurement in 2017, 2019, and 2021.

Mykolaiv also decided to turn an old residential building into a modern one. It is planned to spend more than UAH 143 million on this. The goal of the project is to comprehensively renovate an apartment building located at 21 Velyka Morska Street to improve its technical condition, energy efficiency, comfort, and safety of residents.

In addition, the idea was to create a modern hub out of an old boiler house in Voznesensk. More than UAH 17 million is planned to be spent on the reconstruction of the building. The goal of the growth hub is to combine resources, knowledge and support to accelerate the development of startups, businesses and innovations.

Анна Бальчінос

You may also like:

Aug. 11, 2026

A 27-year-old communist from Pervomaisk was convicted of treason

Analysts said that 76 percent of Kherson residents see no signs of recovery

In Mykolaiv, the search has begun for a caterer for schoolchildren at a cost of 135 million

Mykolaiv Region Was Attacked by UAVs: Homes Damaged, 75-Year-Old Woman Injured

Aug. 10, 2026

The SBU detained a Russian agent from Kherson who was planning to kill a soldier

A child drowned for the second time at a closed beach in Mykolaiv

In the Odesa region, power was restored to 226,000 customers following the attack

The director of the Mykolaiv City Hospital declared a Lexus at a bargain price

A spy was arrested in Mykolaiv for plotting to kill a soldier in Kyiv

The enemy struck a church in the Mykolaiv region

Aug. 9, 2026

A law firm owned by a lawmaker won the contract to repair seven kilometers of road for 107 million in the Odesa region

Online Education and Studying Abroad: How to Combine a Ukrainian School with an International Education Advertisement

The father of the secretary of the Mykolaiv City Council gave his son a million

Three people were killed in a traffic accident in the Odesa region; eight others are in the hospital

Aug. 8, 2026

The occupiers have devised new methods for militarizing children in the Kherson region