15 August 2024

Mykolaiv decided to take care of comfortable education for children

(PHOTOS: ALL Online)

The Mykolaiv City Council's Education Department has decided to repair two educational institutions. A gymnasium and a kindergarten are to be repaired by November 30.

This is evidenced by data from the Prozorro public procurement system.

Thus, it is planned to repair a building in Mykolaiv gymnasium No. 43 and a building in kindergarten No. 133. UAH 189,428.94 has been allocated for the renovation of the gymnasium and UAH 358,690.24 for the kindergarten.

The auction is scheduled to start on August 22. The customer will pay for the services after acceptance of the work within 30 days. In both cases, no security is required to ensure the fulfillment of the procurement contract.

Bidders must submit documents as part of their bids that confirm that their proposal meets the technical, qualitative, quantitative and other requirements. For example, there must be estimate documentation, a valid certificate of a design engineer and a scanned original of the permit on the compliance of the material and technical base with the requirements of the law.

All repairs must be completed by November 30, 2024.

Recently, the Department of Mykolaiv Regional State Administration has again announced an auction for the overhaul and restoration of the local college. It is planned to spend almost UAH 60 million from the budget.

Also in the Mykolaiv region, the reconstruction of a kindergarten in the village of Trykratne is planned. This will take more than UAH 75 million from the funds that were supposed to be used to complete the construction of the Tashlyk PSPP. The source of funding is Energoatom.

In addition, they are going to reconstruct shelters for children for almost UAH 15 million. The work was commissioned by the Education and Sports Department of the Executive Committee of the Bashtanka City Council. It is planned to reconstruct the radiation shelter No. 52107 in the building of Bashtanka Lyceum No. 1.

You may also like:

July 13, 2026

Theramid: A Breakdown of the Spanish Brand's Products and How to Choose the Right Serum for Your Needs Advertisement

A new director has been appointed to head the Drug Enforcement Administration in the Mykolaiv region

The director of a medical facility in the Mykolaiv region is suspected of causing 11 million in losses to the state

An instructor in the recruitment and staffing department was found guilty of bribery

In Mykolaiv, more than 20 million hryvnias were spent on the opening of an endovascular neurosurgery unit

Common Mistakes Made During Website Development That Can Cost a Business Customers Advertisement

In the Odesa region, 37 FOPs have been blacklisted by antitrust authorities

July 12, 2026

A medical facility in Mykolaiv is planning renovations costing one million hryvnias

Construction giant wins a 126-million contract for a project near the Dniester River

A memorial event for fallen soldiers was held in downtown Mykolaiv

Eight new recreational areas will be created in the forests of the Mykolaiv and Odesa regions

The Mykolaiv Zoo shared the story of the ponies rescued from the Kherson region

July 11, 2026

A trial has begun in Mykolaiv against an official accused of embezzling 1.3 million on traffic lights

In Odessa, a company implicated in an embezzlement case was awarded a 21-million contract for cogeneration

In Mykolaiv, the high school's cafeteria will be renovated for 27.5 million