14 November 2025

Mykolaiv city authorities have planned UAH 116 million to repair internal networks

(Repair of networks. PHOTO: svidok.info)

Mykolaiv city authorities have planned to extend the program of reimbursement for the repair of intra-building networks until 2026. It was decided to allocate more than UAH 116 million for this purpose.

This is stated in the draft decision of the Mykolaiv City Council.

The Mykolaiv City Council has approved the extension and updating of the Program for reimbursement of costs for the restoration of intra-building water supply, sewage and heat supply networks for co-owners of apartment buildings. The program, which was in effect for 2023-2025, now extends to 2026.

The decision of the city council provides for an increase in funding - a total of UAH 116.4 million for 2023-2026, of which half is from the city budget and the other half from additional sources. Funding is distributed by year: UAH 20 million in 2023, UAH 26 million in 2024, UAH 32 million in 2025, and UAH 38.4 million is planned for 2026.

As stated in the draft decision, the program includes a number of activities: an information campaign to engage co-owners of apartment buildings, methodological support for initiative groups, and direct implementation of repairs to water supply, sewage, and heating networks. Residents participating in the program will be able to receive reimbursement for the costs of repairing common property.

Control over the implementation of the decision is entrusted to the city council's standing committees on economic policy and housing and communal services, as well as to the deputy mayor. The goal of the program is to provide city residents with uninterrupted water and heat supply and improve the technical condition of in-building networks.

In 2024, 23 condominiums joined the energy saving program, raising over UAH 81 million. The city budget compensated them for about UAH 9 million. As part of the program, they overhauled heating systems, insulated facades, attics and basements, installed individual heating points and heat distributors, and replaced windows.

Анна Бальчінос

You may also like:

Aug. 14, 2026

The head of the Department of Children's Affairs in the Mykolaiv region was involved in a scheme involving fictitious guardianships

Aug. 13, 2026

The head of the Mykolaiv Regional Election Commission was arrested for accepting a bribe

Two dealers from the Mykolaiv region were punished for attempting to sell ancient coins abroad

740 million has been spent on repairing power grids in the Odesa region, and another billion is being allocated

In Mykolaiv Oblast, an official was punished for land fraud involving a park

Aug. 12, 2026

170 million per kilometer: The Mykolaiv Region Reconstruction Service held its second tender with a single contractor

A Russian citizen was taken into custody following a fatal traffic accident on the Odesa-Mykolaiv highway

Legal Work in Poland in 2026: How to Choose a City and Avoid Illegal Employment Advertisement

Lawmakers have allocated 456 million for the charter of Mykolaiv Electrotrans

A farm worker from the Mykolaiv region was punished for damaging an archaeological site

A woman from Mykolaiv was sent to a pretrial detention center for coordinating attacks on military units

Aug. 11, 2026

A 27-year-old communist from Pervomaisk was convicted of treason

In Mykolaiv, the search has begun for a caterer for schoolchildren at a cost of 135 million

Mykolaiv Region Was Attacked by UAVs: Homes Damaged, 75-Year-Old Woman Injured

Reconstruction in 2026: What Compensation Is Currently Available for Damaged or Destroyed Homes