Feb. 28, 2026, 7:25 p.m.

Kherson seizes property of entrepreneur over corruption in dormitory renovation

(ILLUSTRATION: justice.dp.ua)

In Kherson, a court seized the property of an entrepreneur on suspicion of malpractice. During the overhaul of a local college dormitory, the subcontractor overestimated the cost of the work.

This is evidenced by the ruling of the Zavodskyi District Court of Mykolaiv.

According to the investigation, the entrepreneur did not check the work reports, which led to an overestimation of the volume and cost of construction work during the overhaul of the dormitory of the Kherson Polytechnic College of Odesa Polytechnic State University.

In December 2023, the entrepreneur and the college entered into an agreement for the overhaul of the dormitory damaged as a result of the armed aggression of the Russian Federation. The contractor was obliged to complete the work within a certain time frame, control the quality and scope of work, check the materials used and keep documentation.

The entrepreneur also entered into an agreement with a subcontractor to perform the work. At the same time, the investigation found that the entrepreneur failed to verify the actual scope and cost of the work performed. In particular, the installation of metal-plastic windows of various sizes, installation of plastic window sills, insulation of slopes with mineral slabs with decorative finishes, and the use of drywall and insulation.

Nevertheless, he signed an acceptance certificate worth more than one million hryvnias, which certified the full completion of the work and the use of materials.

The examination found that the scope and cost of the actual work did not correspond to the documentation, and the overstatement amounted to more than UAH 141 thousand.

On January 23, 2026, the entrepreneur was suspected of negligence. The court ruled to seize the suspect's property, including a 2008 Hyundai Matrix car, and prohibited its alienation and disposal.

Also in Kherson, the court granted investigators temporary access to documentation on the construction of radiation shelters for schools. The case concerns possible misappropriation or embezzlement of budget funds.

Анна Бальчінос

Також Вам може сподобатись:

April 14, 2026

High Council of Justice upholds dismissal of judge who tried to hide in the Armed Forces

Russia continues to attack hospitals in Kherson

Odesa court returns case of participant in Deepwater Horizon scam to court

April 13, 2026

Fictitious certificates and 5 million in his pocket: in Kherson, the contractor's duties were extended

Mykolaiv region appoints trial on embezzlement of funds during kovid

Founder of a charitable foundation is suspected of financing the Russian army in Kherson region

Easter bread from occupied Oleshky became a symbol of survival

Grain worth 800 thousand dollars: how a cargo from Mykolaiv region disappeared on the way to export

Former member of Kherson executive committee sentenced to 10 years in prison

April 12, 2026

Woman convicted in Rozdilna for reporting on TCC checkpoints

Amazing South: natural treasure of Kherson region

Kherson court upholds fine imposed on 19-year-old by TCC

FSB agent in Odesa sentenced to 15 years

Kherson resident, who was taken away with a bag on his head, returned from captivity

Transport in Kherson operates on a reduced schedule