05 January 2025

In Mykolaiv, a hospital ordered tests from another medical institution for almost 3 million hryvnias

(Photo: univerclinic.com.ua)

In Mykolaiv, Children's Hospital #2 ordered laboratory tests from another medical institution without a tender procedure worth almost UAH 3 million.

The Center for Public Investigations learned about this from the Prozorro electronic system.

On January 3, the municipal non-profit enterprise of the Mykolaiv City Council, City Children's Hospital No. 2, signed a contract with City Hospital No. 1. Representatives of the medical institution decided not to hold a tender, concluding the agreement without using the electronic system. One hospital will pay UAH 2 million 797 thousand to the other for the tests.

According to the contract, during the year, Hospital No. 1 is to provide laboratory services to the children's hospital under the state order. These include: determining the level of enzymes such as creatine phosphokinase and lactate dehydrogenase; checking indicators that characterize the body's functioning, such as cholesterol, triglycerides, iron, potassium, sodium and calcium; testing for hepatitis A, B, C viruses, as well as analysis of immunoglobulins (IgE, IgG, IgM); checking blood parameters such as fibrinogen, platelets and D-dimer, etc.

Earlier, Intent wrote that in Mykolaiv, a tender for the supply of medical equipment worth 16 million was awarded to a company that was accused of misappropriating budget funds and inflating prices.

Meanwhile, a company registered in Switzerland earned more than twenty million hryvnias in 2024 from the supply of equipment for medical institutions in Mykolaiv region. In addition, it was involved in criminal proceedings for misappropriation of budget funds during the procurement of medical equipment.

It was also reported that the reconstruction of the Bashtanka Multidisciplinary Hospital building was being carried out by a company that was involved in a case of misappropriation of budget funds. The company was also accused of abuse of office by prior conspiracy with officials of the Capital Construction Department of Mykolaiv Regional State Administration.

Андрій Колісніченко

You may also like:

July 10, 2026

In Kherson, a suspect accused of causing millions in losses at a school shelter was released on bail

The Chairman of the Mykolaiv Regional Council Has Taken the Helm of the Regional Branch of "Servants"

A winery in northern Odesa Oblast has been put up for sale for 24 million

Opinions are divided in Mykolaiv over the name of the memorial

How to Tell If a Shampoo Isn't Right for Your Hair Type Advertisement

A court in Mykolaiv found a mother guilty of attempting to sell her child

More than half a million metric tons of raw materials from the Mykolaiv Alumina Plant are being prepared for sale

July 9, 2026

In Mykolaiv, there is talk of a shortage of funds for salaries in the cultural sector

The Odesa region plans to spend more than 100 million on renovating a high school building

The "Novy Pryvoz" shopping center in Odesa has been put up for sale for 779 million

Mykolaiv's Housing and Utilities Department Will Spend 16 Million on Its Own Shelter

An advisor to the mayor of Mykolaiv accused a colleague of sabotaging the moment of silence

Residents of Mykolaiv are demanding that an unfinished gas station be demolished

How the War Changed Men's Approach to Job Hunting in 2026 Advertisement

July 8, 2026

Mykolaivvodokanal and the Port of "Pivdennyi" Have Been Designated as Monopolies