31 July 2026

How to Properly Install Mineral Wool Insulation: A Step-by-Step Guide from KRAIZEL

(IMAGE: Created using AI)

The effectiveness of exterior wall insulation depends directly on strict adherence to the installation process at every stage of the work. That is why high-quality installation of insulation ensures there are no thermal bridges and protects the building from heat loss for decades. In such systems, mineral wool is one of the most popular materials; however, its fibrous structure and considerable weight require a special approach to installation. To ensure that mineral wool insulation stays securely attached to the facade and fully retains its thermal insulation properties, it is necessary to ensure maximum adhesion to the wall surface.

For more details, see the article at the following link: https://www.kreisel.ua/trendi-ta-rishennja/jak-pravilno-priklejiti-mineralovatnii-utepljuvach

How do you prepare the substrate before starting work?

The preparation stage involves creating a solid, clean, and dry surface free of dust or flaking. Mineral wool insulation is installed at temperatures between +5 and +25 °C on a substrate that is neither overheated by the sun nor excessively cold.

The main preparation steps include:

A thoroughly prepared surface is essential to ensure uniform adhesion of the adhesive mortar to the wall.

What solutions does the KRAIZEL product line offer?

Specialized dry mixes designed for high-rise construction are used when working with fiber-reinforced panels. The brand’s product line includes the following items:

The use of these specialized materials allows the building’s walls to “breathe” naturally and prevents condensation from accumulating inside the thermal insulation system.

What application and curing technology ensures reliability?

The process requires the sequential application of layers and adherence to specific time intervals. When insulating with mineral wool, the mixture is prepared by mixing the dry material with water until it reaches a plastic consistency.

The technique for applying the adhesive mixture involves:

After 3 days, mechanically fasten the panels using dowels with thermal heads (5–6 per m²). Next, create a 3–5 mm thick reinforced base layer with embedded glass fiber mesh.

Thus, the installation of mineral wool insulation is a technically precise process in which each stage requires strict adherence to procedures. The use of specialized mixtures—KREISEL 230 OB’EKT and KREISEL 240 OB’EKT, combined with proper substrate preparation and correct reinforcement, guarantees maximum energy efficiency of the building and the facade’s durability for many years to come.

Олена Болган

You may also like:

Aug. 21, 2026

In Mykolaiv, a municipal enterprise director was barred from work due to corruption in procurement

The enemy dropped KABs on a dormitory at Kherson University

Aug. 20, 2026

The number of first-graders in Odesa has dropped by 40 percent over the past four years

The court released the man who shot at TCC employees

A documentary about a female volunteer who was abducted by the occupiers was screened in Kherson

Billions on the roads and tetrapods in the water: A lawmaker’s company was selected as the winner of a tender in the Odesa region

The son of the head of the commercial court was detained in the Odesa region for helping someone evade military service

Arsen Zhumadilov announced that he is stepping down as director of the Defense Procurement Agency

In Odessa, the head of a psychiatric hospital ward was taken into custody for a new scheme

During the first half of the year, Switzerland was the top destination for exports from the Odessa region

In Mykolaiv, a doctor was not suspended from his position for disability fraud schemes

No one was willing to buy Odessa's Central Department Store for 400 million

An official at the Kherson Regional Energy Administration has been suspended from duty for accepting kickbacks on military contracts

In Mykolaiv, officials approved the transfer of the land beneath the stadium to the community

Over the past year and a half, the Odessa municipal government has not set a date for the election of the city’s chief architect