27 December 2024

A new residential complex for IDPs is to be built in Mykolaiv region

(PHOTO: Dream)

Mykolaiv region decided to build a residential complex for internally displaced persons. It is planned to raise more than UAH 3 billion for this purpose.

This was reported by the Center for Public Investigations with reference to the Dream ecosystem.

A new construction of a residential apartment complex intended for temporary residence of internally displaced persons in the city of Pervomaisk is planned.

The purpose of the construction is to provide adequate living conditions for people who have lost their homes or had them seriously damaged due to hostilities.

Screenshot: Dream

The project was initiated by the Department of Urban Planning, Architecture, Capital Construction and Project Development of the Mykolaiv Regional State Administration. The Department of Housing and Communal Services of the Pervomaisk City Council was designated as the balance holder.

The project budget is UAH 3.3 billion. It is planned to spend UAH 1 billion 609 million 275 thousand 492 on the construction itself. UAH 359 million 302 thousand 566 will be spent on the purchase of equipment. Other capital expenditures will amount to UAH 1 billion 366 million 883 thousand 823.

Screenshot: Dream

The estimated construction period is 81 months. The construction project is in the implementation status and currently requires funding.

Planning for the construction began in 2022. According to Prozorro, UAH 10 million was allocated from the budget for the production of design and estimate documentation for the facility. The documentation was produced by Concord Project LLC.

Voznesensk also planned to convert a non-residential building into social housing for IDPs and people in difficult life circumstances. Seventy million hryvnias were allocated from the budget for this purpose. After reconstruction, the building will provide housing for 72 people.

Mykolaiv also plans to raise UAH 6 billion to build a water filtration system. The goal of the project is to provide the city with a stable and high-quality water supply through the construction of a pressure filtration system, which will improve the quality of drinking water and increase the reliability of water supply.

Анна Бальчінос

You may also like:

July 29, 2026

Russian intelligence commander charged with war crimes in the Mykolaiv region

Two companies allocated one billion between the energy sector and road projects in the Kherson region

A company owned by a lawmaker from Izmail won a road construction contract in Reni without any competition

The Child Welfare Service provided an update on the girl's condition after she was beaten by her grandmother in the Mykolaiv region

In Mykolaiv, there are plans to increase rent for businesses in parks tenfold

In Izmail, a contract worth one million was awarded to a company owned by a lawmaker for the renovation of a building

In the Odesa region, a business received 50 fines from the TCC

The construction of a maritime terminal in Mykolaiv is now in doubt

July 28, 2026

Lawmakers in Mykolaiv were asked to consider 73 draft resolutions by voice vote

Searching by Last Name: Why It's Harder Than It Seems, and How to Avoid Mistakes Advertisement

A City Hall official in Odesa will stand trial for causing more than half a million in budget losses

A judge from Mykolaiv sold real estate for 1.8 million before stepping down

Military Helmets: Types, Materials, and Design Features Advertisement

New Minister Vitaliy Kim Reported on Changes in His Assets

In Mykolaiv, structures on the grounds of a kindergarten will be demolished to make way for the construction of a shelter