09 February 2025

40 Million UAH Project for Dual-Purpose Radiation Shelter at School

(Photo: DREAM)

A dual-purpose protective structure with the protective properties of a radiation shelter is planned to be built for 40 million hryvnias at the Novovoskresenska school with a preschool department.

According to the Center for Public Investigations, this became known from the digital ecosystem for accountable management of the DREAM recovery .

According to a fundraising announcement published on February 3 by the Humanitarian Affairs Department of the Novovorontsovo Village Council, the construction of the shelter will provide educational services for 25 preschool children and primary education for 56 schoolchildren. In addition, the educational institution is located more than 50 kilometers from the contact line, which will make it possible to organize a mixed form of education, taking into account the security situation.

The project envisages that the shelter will be equipped with two entrances and exits via stairwells and an elevator. At the entrances, there are rooms for changing clothes and storing contaminated clothing. The premises for preschoolers and students in grades 1-2 should be divided into a zone for rest and sleep, a zone for eating and classes, a play area, a zone for placing shoes and clothes, and a zone for adults. The premises for pupils in grades 3-4 should have an area for classes and meals, a play area, a shoe and clothing area, and an adult area. And the premises for students in grades 5-11 should have a classroom and dining area, a shoe and clothing area, and an adult area.

In addition, the working draft provides for free access to the storage facility for people with limited mobility - lowering the side stones on the pavement, the presence of ramps with a standard slope, no height differences at the entrance to the storage facility, with a door width of at least 0.9 m in cleanliness.

The total estimated budget of the project is UAH 40 million. The total amount of confirmed funding sources is still 0.

In total, since the beginning of the year, 11 sites have been added to the DREAM Digital Ecosystem for Accountable Recovery Management, which are planned to be restored in 2025. At the same time, the cost has been calculated for only two reconstruction projects: the repair of the Mental Health Unit and the reconstruction of the Vysokopil Lyceum building.

Олеся Ланцман

You may also like:

Aug. 19, 2026

Ukraine carried out a prisoner exchange; defenders from the Kherson region have returned home

In the Kherson region, a contractor and an engineer are facing trial for fraud involving the repair of damaged buildings

In Kherson, Russians struck a minibus carrying passengers; there are casualties and injuries

The enemy struck an industrial facility in the Mykolaiv region with an X-22 missile

Aug. 18, 2026

A resident of the Kherson region fought against the Ukrainian Armed Forces as a member of "Storm-Z" and will stand trial

Madyar announced new European UAVs for the Kherson sector

The director of an agricultural company owned by Kherson Mayor Kolykhaev was convicted of aiding the Russian Federation

Aug. 17, 2026

In July, the occupiers destroyed more than 10,000 trees and plants in "Askania-Nova"

Fuel Right at Your Fingertips: 5 Reasons Why Businesses Are Choosing Mini Gas Stations Advertisement

The SBU detained a Russian informant in the Kherson region who was directing unmanned aerial vehicles at the Ukrainian Armed Forces

Evacuees from Kherson were stranded in a field for four hours: The Red Cross released photos

Dragon Logistics: Hassle-Free Shipping from China Advertisement

The jewelry industry in Ukraine has been growing for the fifth consecutive year: Odesa Oblast is among the leaders

In the Kherson region, 6 people have been wounded as a result of Russian attacks, and there are power outages

Aug. 16, 2026

A bathhouse attendant from Kakhovka was sentenced to 12 years by the occupiers