09 February 2025

40 Million UAH Project for Dual-Purpose Radiation Shelter at School

(Photo: DREAM)

A dual-purpose protective structure with the protective properties of a radiation shelter is planned to be built for 40 million hryvnias at the Novovoskresenska school with a preschool department.

According to the Center for Public Investigations, this became known from the digital ecosystem for accountable management of the DREAM recovery .

According to a fundraising announcement published on February 3 by the Humanitarian Affairs Department of the Novovorontsovo Village Council, the construction of the shelter will provide educational services for 25 preschool children and primary education for 56 schoolchildren. In addition, the educational institution is located more than 50 kilometers from the contact line, which will make it possible to organize a mixed form of education, taking into account the security situation.

The project envisages that the shelter will be equipped with two entrances and exits via stairwells and an elevator. At the entrances, there are rooms for changing clothes and storing contaminated clothing. The premises for preschoolers and students in grades 1-2 should be divided into a zone for rest and sleep, a zone for eating and classes, a play area, a zone for placing shoes and clothes, and a zone for adults. The premises for pupils in grades 3-4 should have an area for classes and meals, a play area, a shoe and clothing area, and an adult area. And the premises for students in grades 5-11 should have a classroom and dining area, a shoe and clothing area, and an adult area.

In addition, the working draft provides for free access to the storage facility for people with limited mobility - lowering the side stones on the pavement, the presence of ramps with a standard slope, no height differences at the entrance to the storage facility, with a door width of at least 0.9 m in cleanliness.

The total estimated budget of the project is UAH 40 million. The total amount of confirmed funding sources is still 0.

In total, since the beginning of the year, 11 sites have been added to the DREAM Digital Ecosystem for Accountable Recovery Management, which are planned to be restored in 2025. At the same time, the cost has been calculated for only two reconstruction projects: the repair of the Mental Health Unit and the reconstruction of the Vysokopil Lyceum building.

Олеся Ланцман

You may also like:

June 6, 2026

Currency at home and property under occupation: what the heads of Kherson medical institutions declared

Kherson reallocated 419 million to utilities

Kherson resident tortured and threatened to cut off his fingers: court sentences Russian policeman

Ecocide and the tragedy of thousands of people: three years after the explosion of the Kakhovka HPP

For telling the truth about Kherson and the war: American correspondent is awarded an order

June 5, 2026

Case of negligence of technical supervision engineer sent to court in Odesa

102 million for officials: Kherson MVA approves management budget for 2026

Agribusiness in the occupied Kherson region, Cyprus and a deputy from Odesa: SBU uncovers booking scheme

Head of a driving school from Kherson convicted for schemes with fake IDs

Ex-mayor of Kherson Saldo convicted for looting of bakery plant

June 4, 2026

Anti-drone nets, electronic warfare and mobile shelters: how Kherson is being protected

Russian aggression kills 39 children in Kherson region

Repair of shelter for 30 million in Odesa region awarded to company related to MP for the second time

Ex-employee of Ukrzaliznytsia from Kherson detained in Odesa for high treason

Russian aggression kills 6 people in Kherson region, wounds 26 others