09 February 2025

40 Million UAH Project for Dual-Purpose Radiation Shelter at School

(Photo: DREAM)

A dual-purpose protective structure with the protective properties of a radiation shelter is planned to be built for 40 million hryvnias at the Novovoskresenska school with a preschool department.

According to the Center for Public Investigations, this became known from the digital ecosystem for accountable management of the DREAM recovery .

According to a fundraising announcement published on February 3 by the Humanitarian Affairs Department of the Novovorontsovo Village Council, the construction of the shelter will provide educational services for 25 preschool children and primary education for 56 schoolchildren. In addition, the educational institution is located more than 50 kilometers from the contact line, which will make it possible to organize a mixed form of education, taking into account the security situation.

The project envisages that the shelter will be equipped with two entrances and exits via stairwells and an elevator. At the entrances, there are rooms for changing clothes and storing contaminated clothing. The premises for preschoolers and students in grades 1-2 should be divided into a zone for rest and sleep, a zone for eating and classes, a play area, a zone for placing shoes and clothes, and a zone for adults. The premises for pupils in grades 3-4 should have an area for classes and meals, a play area, a shoe and clothing area, and an adult area. And the premises for students in grades 5-11 should have a classroom and dining area, a shoe and clothing area, and an adult area.

In addition, the working draft provides for free access to the storage facility for people with limited mobility - lowering the side stones on the pavement, the presence of ramps with a standard slope, no height differences at the entrance to the storage facility, with a door width of at least 0.9 m in cleanliness.

The total estimated budget of the project is UAH 40 million. The total amount of confirmed funding sources is still 0.

In total, since the beginning of the year, 11 sites have been added to the DREAM Digital Ecosystem for Accountable Recovery Management, which are planned to be restored in 2025. At the same time, the cost has been calculated for only two reconstruction projects: the repair of the Mental Health Unit and the reconstruction of the Vysokopil Lyceum building.

Олеся Ланцман

You may also like:

Sept. 8, 2026

Residents of Kherson are flocking to Mykolaiv in search of housing: prices have risen to 25,000

Occupiers struck a market in the Kherson region with a drone: one person was injured

Sept. 7, 2026

Ukrainian porcelain was exhibited at the Voznesensk Museum

In the occupied Kherson region, Russian documents are left pending for months

The enemy shelled 28 settlements in the Kherson region

Sept. 6, 2026

A major road construction company in the Kherson region was awarded a 14-million contract to repair a road without any competition

Police showed the damaged train following the attack in Chornobaivka

Occupiers struck a high-rise building in Kherson: a family was injured

Sept. 5, 2026

The Kherson authorities have called for children to be evacuated to safer regions

Ukraine's representative to the UN issued a statement regarding a new map that excludes Crimea and the Kherson region

In Chornobaivka, Russian suicide bombers attacked a passenger train

The former head of the State Food and Consumer Service in Mykolaiv has become the face of the occupiers in the Kherson region

The daughter of Saldo, the so-called head of the Kherson region, has been accused of crimes against national security

Sept. 4, 2026

Community leader sentenced to 15 years for coordinating KAB airstrikes on the Kherson region

A collaborator from the Kherson region was brought to trial for torturing a woman with electric shocks