Feb. 9, 2025, 2:31 p.m.

40 Million UAH Project for Dual-Purpose Radiation Shelter at School

(Photo: DREAM)

A dual-purpose protective structure with the protective properties of a radiation shelter is planned to be built for 40 million hryvnias at the Novovoskresenska school with a preschool department.

According to the Center for Public Investigations, this became known from the digital ecosystem for accountable management of the DREAM recovery .

According to a fundraising announcement published on February 3 by the Humanitarian Affairs Department of the Novovorontsovo Village Council, the construction of the shelter will provide educational services for 25 preschool children and primary education for 56 schoolchildren. In addition, the educational institution is located more than 50 kilometers from the contact line, which will make it possible to organize a mixed form of education, taking into account the security situation.

The project envisages that the shelter will be equipped with two entrances and exits via stairwells and an elevator. At the entrances, there are rooms for changing clothes and storing contaminated clothing. The premises for preschoolers and students in grades 1-2 should be divided into a zone for rest and sleep, a zone for eating and classes, a play area, a zone for placing shoes and clothes, and a zone for adults. The premises for pupils in grades 3-4 should have an area for classes and meals, a play area, a shoe and clothing area, and an adult area. And the premises for students in grades 5-11 should have a classroom and dining area, a shoe and clothing area, and an adult area.

In addition, the working draft provides for free access to the storage facility for people with limited mobility - lowering the side stones on the pavement, the presence of ramps with a standard slope, no height differences at the entrance to the storage facility, with a door width of at least 0.9 m in cleanliness.

The total estimated budget of the project is UAH 40 million. The total amount of confirmed funding sources is still 0.

In total, since the beginning of the year, 11 sites have been added to the DREAM Digital Ecosystem for Accountable Recovery Management, which are planned to be restored in 2025. At the same time, the cost has been calculated for only two reconstruction projects: the repair of the Mental Health Unit and the reconstruction of the Vysokopil Lyceum building.

Олеся Ланцман

Також Вам може сподобатись:

April 26, 2026

Part of Kherson without electricity after shelling

Woman dies in hospital after drone attack in Kherson region

7 wounded in Kherson region as a result of Russian attacks

April 25, 2026

An accountant of a corporation from Pervomaisk conducted business in Crimea

Russian soldier gets life sentence for blowing up family in Kherson region

Director of a company from Crimea suspected of supplying fuel to the occupiers

April 24, 2026

Court blocks investigation into corruption in Mykolaiv region

20 thousand teddy bears laid out in the United States to mark abducted children from Crimea and Kherson region

In Kherson, 70 schools and kindergartens stopped working

April 23, 2026

Russian State Duma deputy is suspected of working in occupied Kherson region

"Ukrainians have a 'genetic code of survival' - writer Victoria Belim

Ukraine asks Red Cross to open corridor for evacuation from Oleshky

Zelensky appoints new head of SBU in Kherson region

In Kherson, the enemy attacks utility companies, a garbage truck is attacked

April 22, 2026

In Odesa, deputies say there is a lack of funding for energy and shelters